Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

57

matching recommendations
Reset
NAICS 3119 Other Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UW2209 # 05 Y:2022 05 2022 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $814 $3,411 Not Implemented
UW2209 # 04 Y:2022 04 2022 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,276 $0 Implemented
UW2209 # 03 Y:2022 03 2022 INSTALL OCCUPANCY SENSORS $2,927 $1,771 Not Implemented
UW2209 # 02 Y:2022 02 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,845 $6,616 Implemented
UW2209 # 01 Y:2022 01 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,907 $2,080 Implemented
UW2207 # 01 Y:2022 01 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,161 $0 Implemented
UW2207 # 02 Y:2022 02 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $685 $112 Implemented
UW2207 # 04 Y:2022 04 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,631 $2,080 Implemented
UW2207 # 03 Y:2022 03 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,582 $12,124 Not Implemented
BS0131 # 06 Y:2019 06 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,392 $1,030 Not Implemented
BS0131 # 05 Y:2019 05 2019 INSTALL TIMERS AND/OR THERMOSTATS $217 $170 Not Implemented
BS0131 # 01 Y:2019 01 2019 INSTALL OCCUPANCY SENSORS $442 $300 Not Implemented
BS0131 # 03 Y:2019 03 2019 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $472 $295 Not Implemented
BS0131 # 04 Y:2019 04 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $204 $412 Not Implemented
BS0131 # 02 Y:2019 02 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $79 $38 Not Implemented
OR0712 # 05 Y:2018 05 2018 INSULATE BARE EQUIPMENT $17,619 $17,511 Implemented
OR0712 # 06 Y:2018 06 2018 USE SMALL NUMBER OF HIGH OUTPUT UNITS INSTEAD OF MANY SMALL INEFFICIENT UNITS $6,403 $30,000 Implemented
OR0712 # 04 Y:2018 04 2018 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $16,006 $21,662 Not Implemented
OR0712 # 03 Y:2018 03 2018 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $33,804 $25,271 Not Implemented
OR0712 # 02 Y:2018 02 2018 REPLACE BOILER $56,825 $365,566 Not Implemented
OR0712 # 01 Y:2018 01 2018 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $200,991 $689,600 Implemented
OR0655 # 07 Y:2015 07 2015 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $51,916 $126,000 Not Implemented
OR0655 # 04 Y:2015 04 2015 ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION $175,008 $188,400 Not Implemented
OR0655 # 03 Y:2015 03 2015 TURN OFF EQUIPMENT WHEN NOT IN USE $20,211 $1,000 Not Implemented
OR0655 # 08 Y:2015 08 2015 RECOVER WASTE HEAT FROM EQUIPMENT $4,958 $7,816 Not Implemented