IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

211

matching recommendations
Reset
NAICS 31191 Snack Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD1070 # 01 Y:2024 01 2024 REPAIR AND ELIMINATE STEAM LEAKS $5,413 $1,000 Implemented
UD1070 # 02 Y:2024 02 2024 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $22,179 $2,000 Implemented
SF0611 # 02 Y:2024 02 2024 TURN OFF EQUIPMENT WHEN NOT IN USE $4,908 $0 Implemented
SF0611 # 01 Y:2024 01 2024 TURN OFF EQUIPMENT WHEN NOT IN USE $14,817 $0 Implemented
SF0611 # 03 Y:2024 03 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $61,975 $1,800 Implemented
SF0611 # 06 Y:2024 06 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $165,339 $1,651,070 Implemented
SF0608 # 03 Y:2023 03 2023 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $29,842 $690 Implemented
SF0608 # 04 Y:2023 04 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $1,050 $0 Implemented
SF0608 # 05 Y:2023 05 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $11,235 $4,654 Implemented
SF0608 # 08 Y:2023 08 2023 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $39,597 $29,794 Implemented
SF0608 # 01 Y:2023 01 2023 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $16,747 $400 Implemented
SF0608 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,322 $0 Implemented
MZ0351 # 03 Y:2023 03 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $9,603 $3,000 Implemented
SF0558 # 02 Y:2020 02 2020 USE STEAM PRESSURE REDUCTION TO GENERATE POWER $98,999 $34,416 Implemented
SF0558 # 09 Y:2020 09 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $145 $591 Implemented
SF0558 # 05 Y:2020 05 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,759 $2,995 Implemented
SF0558 # 06 Y:2020 06 2020 INSULATE BARE EQUIPMENT $282 $379 Implemented
SF0558 # 01 Y:2020 01 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,941 $0 Implemented
SF0558 # 04 Y:2020 04 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,252 $4,542 Implemented
GT0949 # 04 Y:2020 04 2020 INSTALL TIMERS AND/OR THERMOSTATS $2,159 $451 Implemented
GT0949 # 03 Y:2020 03 2020 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $2,978 $400 Implemented
SF0556 # 04 Y:2020 04 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,769 $2,289 Implemented
SF0556 # 06 Y:2020 06 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,238 $5,536 Implemented
SF0556 # 05 Y:2020 05 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,729 $864 Implemented
SF0556 # 09 Y:2020 09 2020 USE SOLAR HEAT TO MAKE ELECTRICTY $57,865 $348,493 Implemented