IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

457

matching recommendations
Reset
NAICS 31191 Snack Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0841 # 04 Y:2007 04 2007 USE SYNTHETIC LUBRICANT $4,306 $0 Implemented
GT0841 # 05 Y:2007 05 2007 UPGRADE OBSOLETE EQUIPMENT $5,731 $0 Not Implemented
GT0841 # 06 Y:2007 06 2007 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,623 $1,000 Not Implemented
GT0841 # 07 Y:2007 07 2007 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,453 $9,501 Implemented
GT0841 # 08 Y:2007 08 2007 SCHEDULE USE OF ELEVATORS TO CONSERVE ENERGY $2,640 $15,000 Not Implemented
GT0841 # 09 Y:2007 09 2007 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $1,780 $15,000 Not Implemented
AM0532 # 01 Y:2007 01 2007 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $9,500 $6,500 Implemented
AM0532 # 02 Y:2007 02 2007 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,100 $0 Implemented
AM0532 # 03 Y:2007 03 2007 AIR CONDITION ONLY SPACE NECESSARY $1,700 $5,200 Not Implemented
AM0532 # 04 Y:2007 04 2007 INSTALL OCCUPANCY SENSORS $670 $285 Implemented
AM0532 # 05 Y:2007 05 2007 ADD AREA LIGHTING SWITCHES $320 $65 Implemented
OR0493 # 01 Y:2005 01 2005 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $66,200 $1,000 Not Implemented
OR0493 # 02 Y:2005 02 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,900 $1,900 Not Implemented
OR0493 # 03 Y:2005 03 2005 CROSS-TRAIN PERSONNEL TO AVOID LOST TIME $5,400 $1,000 Not Implemented
OR0493 # 04 Y:2005 04 2005 USE OPTIMUM TEMPERATURE $11,000 $13,000 Not Implemented
OR0493 # 05 Y:2005 05 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,400 $2,500 Not Implemented
OR0493 # 06 Y:2005 06 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,500 $0 Not Implemented
OR0493 # 07 Y:2005 07 2005 INSTALL OCCUPANCY SENSORS $2,400 $3,600 Not Implemented
OR0493 # 08 Y:2005 08 2005 RECOVER WASTE HEAT FROM EQUIPMENT $2,900 $17,000 Not Implemented
OR0481 # 01 Y:2005 01 2005 UPGRADE CONTROLS ON COMPRESSORS $32,471 $0 Not Implemented
OR0481 # 02 Y:2005 02 2005 INSTALL SET-BACK TIMERS $2,880 $300 Not Implemented
OR0481 # 03 Y:2005 03 2005 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $25,000 $26,000 Implemented
OR0481 # 04 Y:2005 04 2005 OPTIMIZE PLANT POWER FACTOR $7,319 $8,000 Not Implemented
CO0562 # 01 Y:2005 01 2005 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $15,350 $10,080 Not Implemented
CO0562 # 02 Y:2005 02 2005 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $10,710 $1,080 Not Implemented