IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

152

matching recommendations
Reset
NAICS 31191 Snack Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0455 # 05 Y:2014 05 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $232,437 $204,574 Implemented
SF0455 # 06 Y:2014 06 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,943 $11,569 Implemented
SF0455 # 07 Y:2014 07 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,151 $3,742 Implemented
SF0455 # 08 Y:2014 08 2014 USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS $13,254 $19,582 Implemented
SF0455 # 09 Y:2014 09 2014 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $13,364 $21,937 Implemented
SF0455 # 10 Y:2014 10 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,651 $2,966 Implemented
SF0455 # 11 Y:2014 11 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $40,078 $103,067 Implemented
SF0455 # 12 Y:2014 12 2014 USE STEAM CONDENSATE FOR HOT WATER SUPPLY (NON-POTABLE) $43,986 $154,938 Implemented
SF0455 # 13 Y:2014 13 2014 INSTALL OCCUPANCY SENSORS $5,163 $31,786 Implemented
SF0455 # 14 Y:2014 14 2014 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $4,061 $12,152 Implemented
SF0398 # 01 Y:2011 01 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,251 $0 Implemented
SF0398 # 02 Y:2011 02 2011 REPAIR AND ELIMINATE STEAM LEAKS $4,412 $0 Implemented
SF0398 # 03 Y:2011 03 2011 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $23,241 $0 Implemented
SF0398 # 04 Y:2011 04 2011 AIR CONDITION ONLY SPACE NECESSARY $4,965 $424 Implemented
SF0398 # 05 Y:2011 05 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $112,927 $56,209 Implemented
SF0398 # 06 Y:2011 06 2011 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $136,531 $212,500 Not Implemented
SF0398 # 07 Y:2011 07 2011 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $975 $2,405 Implemented
SF0398 # 08 Y:2011 08 2011 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,046 $25,868 Not Implemented
SF0398 # 09 Y:2011 09 2011 MINIMIZE WATER USAGE $3,872 $1,867 Not Implemented
SF0386 # 01 Y:2010 01 2010 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $10,471 $0 Not Implemented
SF0386 # 02 Y:2010 02 2010 USE PHOTOCELL CONTROLS $4,307 $3,738 Not Implemented
SF0386 # 03 Y:2010 03 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,677 $1,600 Not Implemented
SF0386 # 04 Y:2010 04 2010 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $3,507 $7,500 Not Implemented
SF0386 # 05 Y:2010 05 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,553 $40,720 Not Implemented
SF0386 # 06 Y:2010 06 2010 INSTALL OCCUPANCY SENSORS $5,315 $18,821 Not Implemented