IAC Assessment: SF0455
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0455
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 2014
Principal Product Almonds
NAICS 311911 - Roasted Nuts and Peanut Butter Manufacturing
SIC 2068 - Salted And Roasted Nuts And Seeds
Sales >$500,000,000
# of Employees 600
Plant Area (Sq.Ft.) 1,400,000
Annual Production 2,000,000 Pounds
Production Hrs. Annual 6,240
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $2,518,516 25,963,122 kWh $0.10
Electricity Demand $162,669 57,684 kW-months/year $2.82
Natural Gas $1,011,593 174,747 MMBtu $5.79
TOTAL ENERGY COSTS $4,008,242
RECOMMENDED SAVINGS* $506,549 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $506,549
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Primary Raw Material Water Consumption Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Primary Raw Material Water Consumption
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $ $ $ $ Tgal
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$26,214
Cost:
$210
$25,499 262,869 $715 253 - - - - - - - - - - $25,499
262,869
kWh
$715
253
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
-
-
Tgal
02: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$94,396
Cost:
-
$63,497 654,586 - - $30,899 5,337 - - - - - - - - $63,497
654,586
kWh
-
-
kW-months/year
$30,899
5,337
MMBtu
-
-
Tgal
-
-
$
-
-
$
-
-
Tgal
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$638
Cost:
$280
$604 6,334 $34 12 - - - - - - - - - - $604
6,334
kWh
$34
12
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
-
-
Tgal
04: 2.1243 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER Savings:
$14,213
Cost:
$10,295
- - - - $9,118 1,575 - - - - - - $5,095 - -
-
kWh
-
-
kW-months/year
$9,118
1,575
MMBtu
-
-
Tgal
-
-
$
-
-
$
$5,095
-
Tgal
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$232,437
Cost:
$204,574
$232,437 2,396,155 - - - - - - - - - - - - $232,437
2,396,155
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
-
-
Tgal
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$12,943
Cost:
$11,569
$12,943 133,431 - - - - - - - - - - - - $12,943
133,431
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
-
-
Tgal
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$4,151
Cost:
$3,742
$4,151 42,795 - - - - - - - - - - - - $4,151
42,795
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
-
-
Tgal
08: 2.2696 USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS Savings:
$13,254
Cost:
$19,582
$12,746 131,400 $508 180 - - - - - - - - - - $12,746
131,400
kWh
$508
180
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
-
-
Tgal
09: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$13,364
Cost:
$21,937
$13,364 137,763 - - - - - - - - - - - - $13,364
137,763
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
-
-
Tgal
10: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$1,651
Cost:
$2,966
$1,590 15,764 $61 20 - - - - - - - - - - $1,590
15,764
kWh
$61
20
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
-
-
Tgal
11: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$40,078
Cost:
$103,067
$38,485 396,741 $1,426 506 - - - - $1,614 - $(-1,447) - - - $38,485
396,741
kWh
$1,426
506
kW-months/year
-
-
MMBtu
-
-
Tgal
$1,614
-
$
$(-1,447)
-
$
-
-
Tgal
12: 2.2128 USE STEAM CONDENSATE FOR HOT WATER SUPPLY (NON-POTABLE) Savings:
$43,986
Cost:
$154,938
- - - - $22,623 3,907 $3,880 4,995 - - - - $17,483 - -
-
kWh
-
-
kW-months/year
$22,623
3,907
MMBtu
$3,880
4,995
Tgal
-
-
$
-
-
$
$17,483
-
Tgal
13: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$5,163
Cost:
$31,786
$4,813 49,614 $350 124 - - - - - - - - - - $4,813
49,614
kWh
$350
124
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
-
-
Tgal
14: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS Savings:
$4,061
Cost:
$12,152
- - $4,061 1,440 - - - - - - - - - - -
-
kWh
$4,061
1,440
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
-
-
Tgal
TOTAL RECOMMENDED Savings:
$506,549
Cost:
$577,098
$410,129 4,227,452 $7,155 2,535 $62,640 10,819 $3,880 4,995 $1,614 - $(-1,447) - $22,578 - $410,129
4,227,452
kWh
$7,155
2,535
kW-months/year
$62,640
10,819
MMBtu
$3,880
4,995
Tgal
$1,614
-
$
$(-1,447)
-
$
$22,578
-
Tgal
TOTAL IMPLEMENTED Savings:
$506,549
Cost:
$577,098
$410,129 4,227,452 $7,155 2,535 $62,640 10,819 $3,880 4,995 $1,614 - $(-1,447) - $22,578 - $410,129
4,227,452
kWh
$7,155
2,535
kW-months/year
$62,640
10,819
MMBtu
$3,880
4,995
Tgal
$1,614
-
$
$(-1,447)
-
$
$22,578
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $ $ $ $ Tgal
Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Primary Raw Material Water Consumption Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Primary Raw Material Water Consumption