Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
152
matching recommendationsNAICS | 31191 | Snack Food Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0386 # 07 Y:2010 | 07 | 2010 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $217 | $461 | Not Implemented |
SD0416 # 01 Y:2009 | 01 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,133 | $35,628 | Implemented |
SD0416 # 02 Y:2009 | 02 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,893 | $5,295 | Implemented |
SD0416 # 03 Y:2009 | 03 | 2009 | USE PHOTOCELL CONTROLS | $3,458 | $4,950 | Implemented |
SD0416 # 04 Y:2009 | 04 | 2009 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $28,586 | $26,000 | Not Implemented |
SD0416 # 05 Y:2009 | 05 | 2009 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $655 | $0 | Implemented |
SD0416 # 06 Y:2009 | 06 | 2009 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $485 | $0 | Implemented |
SD0409 # 01 Y:2008 | 01 | 2008 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $36,255 | $192,000 | Not Implemented |
SD0409 # 02 Y:2008 | 02 | 2008 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $3,543 | $8,540 | Not Implemented |
SD0409 # 03 Y:2008 | 03 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,066 | $6,344 | Implemented |
SD0409 # 04 Y:2008 | 04 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,423 | $6,590 | Implemented |
SD0409 # 05 Y:2008 | 05 | 2008 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,387 | $2,539 | Implemented |
SD0409 # 06 Y:2008 | 06 | 2008 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $1,067 | $183 | Implemented |
SF0361 # 01 Y:2008 | 01 | 2008 | TURN OFF EQUIPMENT WHEN NOT IN USE | $6,816 | $0 | Implemented |
SF0361 # 02 Y:2008 | 02 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $701 | $0 | Implemented |
SF0361 # 03 Y:2008 | 03 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $237 | $162 | Implemented |
SF0361 # 04 Y:2008 | 04 | 2008 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $1,199 | $713 | Implemented |
SF0361 # 05 Y:2008 | 05 | 2008 | INSULATE BARE EQUIPMENT | $1,614 | $1,036 | Implemented |
SF0361 # 06 Y:2008 | 06 | 2008 | HEAT WATER WITH EXHAUST HEAT | $24,668 | $16,423 | Not Implemented |
SF0361 # 07 Y:2008 | 07 | 2008 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,413 | $4,592 | Implemented |
SF0361 # 08 Y:2008 | 08 | 2008 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,039 | $1,502 | Not Implemented |
SF0273 # 01 Y:2003 | 01 | 2003 | REPAIR AND ELIMINATE STEAM LEAKS | $1,765 | $300 | Implemented |
SF0273 # 02 Y:2003 | 02 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,656 | $480 | Implemented |
SF0273 # 03 Y:2003 | 03 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $16,380 | $8,846 | Not Implemented |
SF0273 # 04 Y:2003 | 04 | 2003 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $106,094 | $76,555 | Not Implemented |