IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

34

matching recommendations
Reset
NAICS 31191 Snack Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0601 # 11 Y:2011 11 2011 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $610 $0 Not Implemented
AM0601 # 10 Y:2011 10 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $775 $1,220 Not Implemented
AM0601 # 09 Y:2011 09 2011 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $6,880 $1,500 Not Implemented
AM0601 # 08 Y:2011 08 2011 INSTALL OCCUPANCY SENSORS $1,900 $5,360 Not Implemented
AM0601 # 07 Y:2011 07 2011 PERFORM HIGH CONSISTENCY GAS PHASE CHLORINATION $1,960 $575 Not Implemented
AM0601 # 06 Y:2011 06 2011 INSULATE BARE EQUIPMENT $2,020 $1,360 Not Implemented
AM0601 # 05 Y:2011 05 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,180 $500 Not Implemented
AM0601 # 04 Y:2011 04 2011 OPTIMIZE PLANT POWER FACTOR $2,515 $14,910 Not Implemented
AM0601 # 03 Y:2011 03 2011 USE DEMAND CONTROLLER OR LOAD SHEDDER $3,800 $0 Not Implemented
AM0601 # 02 Y:2011 02 2011 USE MAGNETIC TECHNOLOGY TO TREAT WATER $4,500 $3,090 Not Implemented
AM0601 # 01 Y:2011 01 2011 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $14,600 $500 Not Implemented
SF0398 # 02 Y:2011 02 2011 REPAIR AND ELIMINATE STEAM LEAKS $4,412 $0 Implemented
SF0398 # 01 Y:2011 01 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,251 $0 Implemented
SF0398 # 05 Y:2011 05 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $112,927 $56,209 Implemented
SF0398 # 03 Y:2011 03 2011 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $23,241 $0 Implemented
SF0398 # 07 Y:2011 07 2011 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $975 $2,405 Implemented
SF0398 # 09 Y:2011 09 2011 MINIMIZE WATER USAGE $3,872 $1,867 Not Implemented
SF0398 # 04 Y:2011 04 2011 AIR CONDITION ONLY SPACE NECESSARY $4,965 $424 Implemented
SF0398 # 06 Y:2011 06 2011 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $136,531 $212,500 Not Implemented
SF0398 # 08 Y:2011 08 2011 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,046 $25,868 Not Implemented
OK0804 # 13 Y:2011 13 2011 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,107 $19,271 Not Implemented
OK0804 # 12 Y:2011 12 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $807 $1,843 Not Implemented
OK0804 # 11 Y:2011 11 2011 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,295 $2,286 Not Implemented
OK0804 # 06 Y:2011 06 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,996 $28,404 Not Implemented
OK0804 # 05 Y:2011 05 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,796 $56,474 Implemented