IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

249

matching recommendations
Reset
NAICS 311919 Other Snack Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0366 # 04 Y:2010 04 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,922 $0 Not Implemented
BD0366 # 05 Y:2010 05 2010 IMPROVE LUBRICATION PRACTICES $2,368 $600 Implemented
BD0366 # 06 Y:2010 06 2010 RECOVER WASTE HEAT FROM EQUIPMENT $3,606 $3,000 Not Implemented
BD0366 # 07 Y:2010 07 2010 PREHEAT COMBUSTION AIR WITH WASTE HEAT $21,299 $18,000 n/a
BD0366 # 08 Y:2010 08 2010 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,581 $6,400 Implemented
BD0366 # 09 Y:2010 09 2010 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $565 $0 Not Implemented
AM0565 # 01 Y:2009 01 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,800 $14,966 Implemented
AM0565 # 02 Y:2009 02 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,160 $18 Implemented
AM0565 # 03 Y:2009 03 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,070 $350 Implemented
AM0565 # 04 Y:2009 04 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $766 $381 Implemented
AM0565 # 05 Y:2009 05 2009 INSTALL OCCUPANCY SENSORS $138 $100 Implemented
AM0565 # 06 Y:2009 06 2009 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $110 $488 Not Implemented
GT0855 # 01 Y:2008 01 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,022 $9,780 Implemented
GT0855 # 02 Y:2008 02 2008 INSTALL OCCUPANCY SENSORS $1,127 $1,120 Implemented
GT0855 # 03 Y:2008 03 2008 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $10,291 $19,600 Not Implemented
GT0855 # 04 Y:2008 04 2008 RECOVER WASTE HEAT FROM EQUIPMENT $19,920 $17,000 Not Implemented
GT0855 # 05 Y:2008 05 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $795 $500 Implemented
GT0855 # 06 Y:2008 06 2008 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $834 $2,100 Not Implemented
GT0855 # 07 Y:2008 07 2008 RECOVER WASTE HEAT FROM EQUIPMENT $1,537 $2,500 Not Implemented
GT0855 # 08 Y:2008 08 2008 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,089 $1,350 Not Implemented
SD0409 # 01 Y:2008 01 2008 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $36,255 $192,000 Not Implemented
SD0409 # 02 Y:2008 02 2008 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,543 $8,540 Not Implemented
SD0409 # 03 Y:2008 03 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,066 $6,344 Implemented
SD0409 # 04 Y:2008 04 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,423 $6,590 Implemented
SD0409 # 05 Y:2008 05 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,387 $2,539 Implemented