IAC Assessment: BD0366
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BD0366
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Bradley University
Assessment Year 2010
Principal Product Baked goods
NAICS 311919 - Other Snack Food Manufacturing
SIC 2052 - Cookies And Crackers
Sales $50,000,000-$100,000,000
# of Employees 350
Plant Area (Sq.Ft.) 187,484
Annual Production 55,000,000 Pounds
Production Hrs. Annual 6,864
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $422,973 5,666,443 kWh $0.07
Electricity Demand $71,311 12,991 kW-months/year $5.49
Electricity Fees $29,159 - $ -
Natural Gas $273,177 33,310 MMBtu $8.20
TOTAL ENERGY COSTS $796,620
RECOMMENDED SAVINGS* $62,140 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $28,406
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$9,620
Cost:
$210
$9,620 129,651 - - - - $9,620
129,651
kWh
-
-
kW-months/year
-
-
MMBtu
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$11,837
Cost:
$2,700
$10,362 139,651 $1,475 269 - - $10,362
139,651
kWh
$1,475
269
kW-months/year
-
-
MMBtu
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$2,342
Cost:
$1,000
$2,074 27,958 $268 49 - - $2,074
27,958
kWh
$268
49
kW-months/year
-
-
MMBtu
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$5,922
Cost:
-
$5,243 70,662 $679 124 - - $5,243
70,662
kWh
$679
124
kW-months/year
-
-
MMBtu
05: 2.4312 IMPROVE LUBRICATION PRACTICES Savings:
$2,368
Cost:
$600
$2,097 28,266 $271 49 - - $2,097
28,266
kWh
$271
49
kW-months/year
-
-
MMBtu
06: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$3,606
Cost:
$3,000
- - - - $3,606 439 -
-
kWh
-
-
kW-months/year
$3,606
439
MMBtu
07: 2.2442 PREHEAT COMBUSTION AIR WITH WASTE HEAT Savings:
$21,299
Cost:
$18,000
$(-6,839) (-92,170) $(-884) (-161) $29,022 3,541 $(-6,839)
(-92,170)
kWh
$(-884)
(-161)
kW-months/year
$29,022
3,541
MMBtu
08: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$4,581
Cost:
$6,400
$4,176 56,284 $405 74 - - $4,176
56,284
kWh
$405
74
kW-months/year
-
-
MMBtu
09: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$565
Cost:
-
- - $565 103 - - -
-
kWh
$565
103
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$62,140
Cost:
$31,910
$26,733 360,302 $2,779 507 $32,628 3,980 $26,733
360,302
kWh
$2,779
507
kW-months/year
$32,628
3,980
MMBtu
TOTAL IMPLEMENTED Savings:
$28,406
Cost:
$9,910
$26,255 353,852 $2,151 392 - - $26,255
353,852
kWh
$2,151
392
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas