IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

35

matching recommendations
Reset
NAICS 311919 Other Snack Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0601 # 11 Y:2011 11 2011 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $610 $0 Not Implemented
AM0601 # 01 Y:2011 01 2011 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $14,600 $500 Not Implemented
AM0601 # 02 Y:2011 02 2011 USE MAGNETIC TECHNOLOGY TO TREAT WATER $4,500 $3,090 Not Implemented
AM0601 # 03 Y:2011 03 2011 USE DEMAND CONTROLLER OR LOAD SHEDDER $3,800 $0 Not Implemented
AM0601 # 04 Y:2011 04 2011 OPTIMIZE PLANT POWER FACTOR $2,515 $14,910 Not Implemented
AM0601 # 05 Y:2011 05 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,180 $500 Not Implemented
AM0601 # 06 Y:2011 06 2011 INSULATE BARE EQUIPMENT $2,020 $1,360 Not Implemented
AM0601 # 07 Y:2011 07 2011 PERFORM HIGH CONSISTENCY GAS PHASE CHLORINATION $1,960 $575 Not Implemented
AM0601 # 08 Y:2011 08 2011 INSTALL OCCUPANCY SENSORS $1,900 $5,360 Not Implemented
AM0601 # 09 Y:2011 09 2011 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $6,880 $1,500 Not Implemented
AM0601 # 10 Y:2011 10 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $775 $1,220 Not Implemented
AM0581 # 01 Y:2010 01 2010 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $13,089 $51,900 Not Implemented
AM0565 # 01 Y:2009 01 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,800 $14,966 Implemented
AM0565 # 06 Y:2009 06 2009 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $110 $488 Not Implemented
AM0565 # 05 Y:2009 05 2009 INSTALL OCCUPANCY SENSORS $138 $100 Implemented
AM0565 # 04 Y:2009 04 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $766 $381 Implemented
AM0565 # 03 Y:2009 03 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,070 $350 Implemented
AM0565 # 02 Y:2009 02 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,160 $18 Implemented
AM0537 # 12 Y:2008 12 2008 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $750 $0 Implemented
AM0537 # 01 Y:2008 01 2008 REPLACE BOILER $324,000 $300,000 Not Implemented
AM0537 # 02 Y:2008 02 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $260,000 $750,000 Implemented
AM0537 # 03 Y:2008 03 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $42,100 $1,500 Implemented
AM0537 # 04 Y:2008 04 2008 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $34,300 $25,000 Not Implemented
AM0537 # 05 Y:2008 05 2008 UPGRADE CONVEYORS $34,150 $80,000 Not Implemented
AM0537 # 06 Y:2008 06 2008 USE STEAM PRESSURE REDUCTION TO GENERATE POWER $18,255 $59,850 Implemented