Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
101
matching recommendationsNAICS | 31193 | Flavoring Syrup and Concentrate Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0874 # 10 Y:2013 | 10 | 2013 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $10,382 | $30,000 | Not Implemented |
UD0874 # 08 Y:2013 | 08 | 2013 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $58,058 | $88,200 | Not Implemented |
UD0874 # 03 Y:2013 | 03 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,108 | $38,600 | Not Implemented |
UD0874 # 09 Y:2013 | 09 | 2013 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $4,928 | $12,300 | Not Implemented |
UD0874 # 06 Y:2013 | 06 | 2013 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $95,537 | $39,093 | Not Implemented |
UD0874 # 11 Y:2013 | 11 | 2013 | USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST | $317,641 | $906,381 | Not Implemented |
UD0874 # 07 Y:2013 | 07 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,535 | $0 | Implemented |
UD0874 # 04 Y:2013 | 04 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,148 | $51,240 | Not Implemented |
UD0874 # 05 Y:2013 | 05 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,338 | $6,405 | Not Implemented |
UD0874 # 01 Y:2013 | 01 | 2013 | OPTIMIZE PLANT POWER FACTOR | $23,112 | $20,000 | Not Implemented |
UD0874 # 02 Y:2013 | 02 | 2013 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $16,400 | $200 | Implemented |
WV0446 # 14 Y:2012 | 14 | 2012 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $2,403 | $5,700 | Not Implemented |
WV0446 # 06 Y:2012 | 06 | 2012 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $9,842 | $9,500 | Not Implemented |
WV0446 # 08 Y:2012 | 08 | 2012 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $6,963 | $2,500 | Implemented |
WV0446 # 17 Y:2012 | 17 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,153 | $475 | Implemented |
WV0446 # 01 Y:2012 | 01 | 2012 | BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT | $147,469 | $548,000 | Not Implemented |
WV0446 # 13 Y:2012 | 13 | 2012 | INSTALL / REPAIR INSULATION ON STEAM LINES | $2,788 | $1,351 | Not Implemented |
WV0446 # 12 Y:2012 | 12 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,862 | $1,070 | Implemented |
WV0446 # 11 Y:2012 | 11 | 2012 | REPAIR OR REPLACE STEAM TRAPS | $3,610 | $4,438 | Implemented |
WV0446 # 10 Y:2012 | 10 | 2012 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $6,393 | $423 | Not Implemented |
WV0446 # 09 Y:2012 | 09 | 2012 | DEVELOP A REPAIR/REPLACE POLICY | $6,712 | $5,683 | Implemented |
WV0446 # 07 Y:2012 | 07 | 2012 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $8,197 | $32,125 | Not Implemented |
WV0446 # 02 Y:2012 | 02 | 2012 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $21,144 | $70,000 | Not Implemented |
WV0446 # 04 Y:2012 | 04 | 2012 | ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM | $16,273 | $1,000 | Implemented |
WV0446 # 03 Y:2012 | 03 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $20,208 | $21,000 | Not Implemented |