Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
19
matching recommendationsNAICS | 31194 | Seasoning and Dressing Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WI0506 # 07 Y:2006 | 07 | 2006 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $990 | $1,500 | Implemented |
WI0506 # 06 Y:2006 | 06 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,430 | $0 | Implemented |
WI0506 # 05 Y:2006 | 05 | 2006 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $1,795 | $800 | Implemented |
WI0506 # 04 Y:2006 | 04 | 2006 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,464 | $1,000 | Implemented |
WI0506 # 03 Y:2006 | 03 | 2006 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $3,464 | $0 | Not Implemented |
WI0506 # 02 Y:2006 | 02 | 2006 | INSTALL TIMERS AND/OR THERMOSTATS | $1,049 | $0 | Implemented |
WI0506 # 01 Y:2006 | 01 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,973 | $16,740 | Implemented |
WI0481 # 10 Y:2005 | 10 | 2005 | INSULATE BARE EQUIPMENT | $1,933 | $250 | Implemented |
WI0481 # 12 Y:2005 | 12 | 2005 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $700 | $1,700 | Implemented |
WI0481 # 11 Y:2005 | 11 | 2005 | RECOVER WASTE HEAT FROM EQUIPMENT | $547 | $1,200 | Not Implemented |
WI0481 # 01 Y:2005 | 01 | 2005 | INSTALL EQUIPMENT TO MOVE PRODUCT | $220,500 | $28,500 | n/a |
WI0481 # 09 Y:2005 | 09 | 2005 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,080 | $500 | Implemented |
WI0481 # 08 Y:2005 | 08 | 2005 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $4,275 | $5,500 | Not Implemented |
WI0481 # 07 Y:2005 | 07 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,863 | $1,280 | Implemented |
WI0481 # 06 Y:2005 | 06 | 2005 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,392 | $1,600 | Not Implemented |
WI0481 # 05 Y:2005 | 05 | 2005 | REPAIR OR REPLACE STEAM TRAPS | $6,480 | $1,410 | Not Implemented |
WI0481 # 04 Y:2005 | 04 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,772 | $32,176 | n/a |
WI0481 # 03 Y:2005 | 03 | 2005 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $30,366 | $8,400 | Not Implemented |
WI0481 # 02 Y:2005 | 02 | 2005 | UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS | $187,529 | $126,000 | Not Implemented |