IAC logo
IAC Assessment: WI0506
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WI0506
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 2006
Principal Product Spices & seasonings
NAICS 311942 - Spice and Extract Manufacturing
SIC 2099 - Food Preparations, Nec
Sales $10,000,000-$50,000,000
# of Employees 78
Plant Area (Sq.Ft.) 48,000
Annual Production 37,000,000 Pounds
Production Hrs. Annual 6,000
Location (State) WI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $50,343 1,495,440 kWh $0.03
Electricity Demand $37,433 3,434 kW-months/year $10.90
Natural Gas $27,256 3,020 MMBtu $9.03
TOTAL ENERGY COSTS $115,032
RECOMMENDED SAVINGS* $19,165 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $15,701
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$7,973
Cost:
$16,740
$4,839 136,710 $3,134 274 - - $4,839
136,710
kWh
$3,134
274
kW-months/year
-
-
MMBtu
02: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$1,049
Cost:
-
$419 11,839 $269 24 $361 340 $419
11,839
kWh
$269
24
kW-months/year
$361
340
MMBtu
03: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$3,464
Cost:
-
- - $3,464 597 - - -
-
kWh
$3,464
597
kW-months/year
-
-
MMBtu
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$2,464
Cost:
$1,000
- - - - $2,464 273 -
-
kWh
-
-
kW-months/year
$2,464
273
MMBtu
05: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS Savings:
$1,795
Cost:
$800
- - $1,795 131 - - -
-
kWh
$1,795
131
kW-months/year
-
-
MMBtu
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,430
Cost:
-
$832 23,499 $598 52 - - $832
23,499
kWh
$598
52
kW-months/year
-
-
MMBtu
07: 2.6121 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED Savings:
$990
Cost:
$1,500
- - - - $990 110 -
-
kWh
-
-
kW-months/year
$990
110
MMBtu
TOTAL RECOMMENDED Savings:
$19,165
Cost:
$20,040
$6,090 172,048 $9,260 1,078 $3,815 723 $6,090
172,048
kWh
$9,260
1,078
kW-months/year
$3,815
723
MMBtu
TOTAL IMPLEMENTED Savings:
$15,701
Cost:
$20,040
$6,090 172,048 $5,796 481 $3,815 723 $6,090
172,048
kWh
$5,796
481
kW-months/year
$3,815
723
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas