IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

202

matching recommendations
Reset
NAICS 311941 Mayonnaise, Dressing, and Other Prepared Sauce Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LL0323 # 01 Y:2009 01 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $116,211 $8,680 Implemented
LL0323 # 02 Y:2009 02 2009 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $8,990 $990 Not Implemented
LL0323 # 03 Y:2009 03 2009 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,498 $990 Not Implemented
LL0323 # 04 Y:2009 04 2009 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $682 $623 Not Implemented
LL0323 # 05 Y:2009 05 2009 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $315 $190 Not Implemented
SD0419 # 01 Y:2009 01 2009 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $17,800 $10,000 Implemented
SD0419 # 02 Y:2009 02 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $12,170 $1,000 Implemented
SD0419 # 03 Y:2009 03 2009 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $7,840 $10,000 Not Implemented
SD0419 # 04 Y:2009 04 2009 INCREASE AMOUNT OF CONDENSATE RETURNED $15,940 $2,263 Implemented
SD0419 # 05 Y:2009 05 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $49,905 $161,162 Implemented
SD0419 # 06 Y:2009 06 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $39,102 $50,136 Not Implemented
SD0419 # 07 Y:2009 07 2009 INSTALL TIMERS AND/OR THERMOSTATS $14,906 $500 Not Implemented
LL0316 # 01 Y:2009 01 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,707 $1,980 Implemented
LL0316 # 02 Y:2009 02 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,047 $30 Implemented
LL0316 # 03 Y:2009 03 2009 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $2,762 $150 Not Implemented
LL0316 # 04 Y:2009 04 2009 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $791 $1,565 Not Implemented
LL0316 # 05 Y:2009 05 2009 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $585 $396 Not Implemented
LL0316 # 06 Y:2009 06 2009 INSTALL OCCUPANCY SENSORS $271 $90 Not Implemented
WV0328 # 01 Y:2005 01 2005 INSTALL SHELVES / RACKS TO UTILIZE UNUSED SPACE $89,602 $72,720 Not Implemented
WV0328 # 02 Y:2005 02 2005 UTILIZE A LESS EXPENSIVE COOLING METHOD $4,992 $0 Not Implemented
WV0328 # 03 Y:2005 03 2005 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $3,942 $18,000 Implemented
WV0328 # 04 Y:2005 04 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,040 $60 Implemented
WV0328 # 05 Y:2005 05 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $948 $0 Implemented
WV0328 # 06 Y:2005 06 2005 USE SYNTHETIC LUBRICANT $649 $30 Not Implemented
WV0328 # 07 Y:2005 07 2005 DEVELOP A REPAIR/REPLACE POLICY $646 $278 Implemented