IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

130

matching recommendations
Reset
NAICS 311942 Spice and Extract Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0323 # 06 Y:2011 06 2011 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $2,360 $6,000 Implemented
LE0323 # 07 Y:2011 07 2011 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,240 $542 Not Implemented
LE0323 # 08 Y:2011 08 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $837 $2,921 Implemented
LE0323 # 09 Y:2011 09 2011 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $778 $0 Implemented
MI0160 # 01 Y:2008 01 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $20,466 $1,032 Implemented
MI0160 # 02 Y:2008 02 2008 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $22,048 $8,641 Not Implemented
MI0160 # 03 Y:2008 03 2008 UTILIZE SENSORS CONTROLLING ROOF AND WALL OPENINGS $16,476 $474 Implemented
MI0160 # 04 Y:2008 04 2008 UTILIZE A LESS EXPENSIVE COOLING METHOD $11,340 $15,475 Not Implemented
MI0160 # 05 Y:2008 05 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,705 $17,226 Implemented
MI0160 # 06 Y:2008 06 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,319 $24 Implemented
MI0160 # 07 Y:2008 07 2008 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $5,440 $3,411 Not Implemented
WI0506 # 01 Y:2006 01 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,973 $16,740 Implemented
WI0506 # 02 Y:2006 02 2006 INSTALL TIMERS AND/OR THERMOSTATS $1,049 $0 Implemented
WI0506 # 03 Y:2006 03 2006 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,464 $0 Not Implemented
WI0506 # 04 Y:2006 04 2006 RECOVER WASTE HEAT FROM EQUIPMENT $2,464 $1,000 Implemented
WI0506 # 05 Y:2006 05 2006 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,795 $800 Implemented
WI0506 # 06 Y:2006 06 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,430 $0 Implemented
WI0506 # 07 Y:2006 07 2006 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $990 $1,500 Implemented
LE0216 # 01 Y:2005 01 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,847 $1,200 Not Implemented
LE0216 # 02 Y:2005 02 2005 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $3,467 $4,000 Not Implemented
LE0216 # 03 Y:2005 03 2005 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,748 $2,000 Not Implemented
LE0216 # 04 Y:2005 04 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,613 $320 Not Implemented
LE0216 # 05 Y:2005 05 2005 USE SYNTHETIC LUBRICANT $429 $200 Not Implemented
LE0216 # 06 Y:2005 06 2005 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,078 $110 Not Implemented
LE0216 # 07 Y:2005 07 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,315 $40,077 Not Implemented