Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
85
matching recommendationsNAICS | 311942 | Spice and Extract Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0323 # 09 Y:2011 | 09 | 2011 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $778 | $0 | Implemented |
LE0323 # 08 Y:2011 | 08 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $837 | $2,921 | Implemented |
LE0323 # 07 Y:2011 | 07 | 2011 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $1,240 | $542 | Not Implemented |
LE0323 # 06 Y:2011 | 06 | 2011 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $2,360 | $6,000 | Implemented |
LE0323 # 05 Y:2011 | 05 | 2011 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $2,867 | $192 | Not Implemented |
LE0323 # 04 Y:2011 | 04 | 2011 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $4,933 | $3,000 | Not Implemented |
LE0323 # 03 Y:2011 | 03 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,384 | $1,000 | Implemented |
LE0323 # 02 Y:2011 | 02 | 2011 | USE SOLAR HEAT TO HEAT WATER | $11,446 | $21,000 | Not Implemented |
LE0323 # 01 Y:2011 | 01 | 2011 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $30,859 | $30,000 | Not Implemented |
MI0160 # 04 Y:2008 | 04 | 2008 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $11,340 | $15,475 | Not Implemented |
MI0160 # 07 Y:2008 | 07 | 2008 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $5,440 | $3,411 | Not Implemented |
MI0160 # 05 Y:2008 | 05 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,705 | $17,226 | Implemented |
MI0160 # 03 Y:2008 | 03 | 2008 | UTILIZE SENSORS CONTROLLING ROOF AND WALL OPENINGS | $16,476 | $474 | Implemented |
MI0160 # 06 Y:2008 | 06 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,319 | $24 | Implemented |
MI0160 # 02 Y:2008 | 02 | 2008 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $22,048 | $8,641 | Not Implemented |
MI0160 # 01 Y:2008 | 01 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $20,466 | $1,032 | Implemented |
WI0506 # 07 Y:2006 | 07 | 2006 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $990 | $1,500 | Implemented |
WI0506 # 06 Y:2006 | 06 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,430 | $0 | Implemented |
WI0506 # 05 Y:2006 | 05 | 2006 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $1,795 | $800 | Implemented |
WI0506 # 04 Y:2006 | 04 | 2006 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,464 | $1,000 | Implemented |
WI0506 # 02 Y:2006 | 02 | 2006 | INSTALL TIMERS AND/OR THERMOSTATS | $1,049 | $0 | Implemented |
WI0506 # 03 Y:2006 | 03 | 2006 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $3,464 | $0 | Not Implemented |
WI0506 # 01 Y:2006 | 01 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,973 | $16,740 | Implemented |
LE0216 # 06 Y:2005 | 06 | 2005 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,078 | $110 | Not Implemented |
LE0216 # 07 Y:2005 | 07 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,315 | $40,077 | Not Implemented |