IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

262

matching recommendations
Reset
NAICS 31199 All Other Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0060 # 01 Y:2010 01 2010 INSTALL OCCUPANCY SENSORS $32,699 $5,400 Implemented
LE0300 # 03 Y:2010 03 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $17,838 $19,900 Implemented
LE0300 # 04 Y:2010 04 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,921 $2,440 Implemented
LE0300 # 05 Y:2010 05 2010 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $7,417 $30,000 Implemented
LE0300 # 06 Y:2010 06 2010 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,315 $3,000 Implemented
LE0300 # 07 Y:2010 07 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,827 $1,000 Implemented
LE0300 # 08 Y:2010 08 2010 INSTALL OCCUPANCY SENSORS $8,078 $900 Implemented
LE0300 # 09 Y:2010 09 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $32,263 $42,718 Implemented
UF0426 # 04 Y:2009 04 2009 INSTALL SKYLIGHTS $2,555 $238 Implemented
UF0426 # 09 Y:2009 09 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,528 $628 Implemented
OK0778 # 01 Y:2009 01 2009 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $171,482 $47,731 Implemented
OK0778 # 02 Y:2009 02 2009 INSTALL / REPAIR INSULATION ON STEAM LINES $4,464 $1,266 Implemented
OK0778 # 03 Y:2009 03 2009 REPAIR AND ELIMINATE STEAM LEAKS $13,933 $525 Implemented
OK0778 # 04 Y:2009 04 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,111 $5,417 Implemented
OK0778 # 05 Y:2009 05 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $412 $0 Implemented
SF0364 # 01 Y:2008 01 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,446 $0 Implemented
SF0364 # 02 Y:2008 02 2008 INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS $4,812 $1,046 Implemented
SF0364 # 03 Y:2008 03 2008 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,974 $913 Implemented
SF0364 # 04 Y:2008 04 2008 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,655 $798 Implemented
SF0364 # 06 Y:2008 06 2008 BURN A LESS EXPENSIVE GRADE OF FUEL $85,730 $61,250 Implemented
SF0364 # 09 Y:2008 09 2008 INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS $9,060 $11,740 Implemented
SF0364 # 10 Y:2008 10 2008 REDUCE EXCESSIVE BOILER BLOWDOWN $6,734 $8,900 Implemented
SF0364 # 11 Y:2008 11 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $409 $801 Implemented
SF0364 # 12 Y:2008 12 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,909 $2,854 Implemented
SF0364 # 13 Y:2008 13 2008 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,296 $2,489 Implemented