Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
23
matching recommendationsNAICS | 31199 | All Other Food Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TR0042 # 03 Y:2022 | 03 | 2022 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $18,544 | $6,243 | Implemented |
TR0042 # 01 Y:2022 | 01 | 2022 | INSTALL OCCUPANCY SENSORS | $141 | $52 | Implemented |
TR0030 # 04 Y:2022 | 04 | 2022 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $3,744 | $7,758 | Implemented |
TR0030 # 03 Y:2022 | 03 | 2022 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $6,145 | $7,000 | Implemented |
TR0030 # 02 Y:2022 | 02 | 2022 | INSTALL OCCUPANCY SENSORS | $133 | $195 | Implemented |
TR0030 # 01 Y:2022 | 01 | 2022 | USE SOLAR HEAT TO MAKE ELECTRICTY | $13,094 | $200,200 | Implemented |
TA0127 # 04 Y:2006 | 04 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,752 | $0 | Implemented |
TA0127 # 02 Y:2006 | 02 | 2006 | ELIMINATE LEAKS IN COMBUSTIBLE GAS LINES | $625 | $100 | Implemented |
TA0127 # 01 Y:2006 | 01 | 2006 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $4,212 | $0 | Implemented |
AM0511 # 05 Y:2006 | 05 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,160 | $150 | Implemented |
AM0511 # 01 Y:2006 | 01 | 2006 | OPTIMIZE PLANT POWER FACTOR | $18,600 | $59,000 | Implemented |
AM0439 # 12 Y:2003 | 12 | 2003 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $1,140 | $400 | Implemented |
AM0439 # 01 Y:2003 | 01 | 2003 | PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST | $910,000 | $435,000 | Implemented |
AM0439 # 11 Y:2003 | 11 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,290 | $1,460 | Implemented |
AM0439 # 10 Y:2003 | 10 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,500 | $980 | Implemented |
AM0439 # 09 Y:2003 | 09 | 2003 | INSULATE BARE EQUIPMENT | $4,890 | $550 | Implemented |
AM0439 # 08 Y:2003 | 08 | 2003 | REPAIR OR REPLACE STEAM TRAPS | $7,600 | $1,120 | Implemented |
AM0439 # 07 Y:2003 | 07 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,400 | $1,000 | Implemented |
AM0439 # 06 Y:2003 | 06 | 2003 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $13,200 | $7,600 | Implemented |
AM0439 # 05 Y:2003 | 05 | 2003 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $15,600 | $500 | Implemented |
AM0439 # 04 Y:2003 | 04 | 2003 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $31,700 | $270 | Implemented |
AM0439 # 03 Y:2003 | 03 | 2003 | REDUCE OR ELIMINATE WASTE | $36,600 | $220 | Implemented |
AM0439 # 02 Y:2003 | 02 | 2003 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $79,200 | $1,200 | Implemented |