IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

21

matching recommendations
Reset
NAICS 31199 All Other Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TR0030 # 04 Y:2022 04 2022 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $3,744 $7,758 Implemented
TR0030 # 03 Y:2022 03 2022 USE DEMAND CONTROLLER OR LOAD SHEDDER $6,145 $7,000 Implemented
TR0030 # 02 Y:2022 02 2022 INSTALL OCCUPANCY SENSORS $133 $195 Implemented
TR0030 # 01 Y:2022 01 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $13,094 $200,200 Implemented
TA0127 # 04 Y:2006 04 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,752 $0 Implemented
TA0127 # 02 Y:2006 02 2006 ELIMINATE LEAKS IN COMBUSTIBLE GAS LINES $625 $100 Implemented
TA0127 # 01 Y:2006 01 2006 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $4,212 $0 Implemented
AM0511 # 05 Y:2006 05 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,160 $150 Implemented
AM0511 # 01 Y:2006 01 2006 OPTIMIZE PLANT POWER FACTOR $18,600 $59,000 Implemented
AM0439 # 11 Y:2003 11 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,290 $1,460 Implemented
AM0439 # 12 Y:2003 12 2003 ELIMINATE LEAKS IN WATER LINES AND VALVES $1,140 $400 Implemented
AM0439 # 01 Y:2003 01 2003 $910,000 $435,000 Implemented
AM0439 # 10 Y:2003 10 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,500 $980 Implemented
AM0439 # 09 Y:2003 09 2003 INSULATE BARE EQUIPMENT $4,890 $550 Implemented
AM0439 # 08 Y:2003 08 2003 REPAIR OR REPLACE STEAM TRAPS $7,600 $1,120 Implemented
AM0439 # 07 Y:2003 07 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,400 $1,000 Implemented
AM0439 # 06 Y:2003 06 2003 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $13,200 $7,600 Implemented
AM0439 # 05 Y:2003 05 2003 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $15,600 $500 Implemented
AM0439 # 04 Y:2003 04 2003 $31,700 $270 Implemented
AM0439 # 03 Y:2003 03 2003 REDUCE OR ELIMINATE WASTE $36,600 $220 Implemented
AM0439 # 02 Y:2003 02 2003 $79,200 $1,200 Implemented