Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
212
matching recommendationsNAICS | 311991 | Perishable Prepared Food Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0778 # 04 Y:2009 | 04 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,111 | $5,417 | Implemented |
OK0778 # 05 Y:2009 | 05 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $412 | $0 | Implemented |
MI0155 # 01 Y:2007 | 01 | 2007 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $66,401 | $120,000 | Not Implemented |
MI0155 # 02 Y:2007 | 02 | 2007 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $51,399 | $22,558 | Not Implemented |
MI0155 # 03 Y:2007 | 03 | 2007 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $31,061 | $2,665 | Not Implemented |
MI0155 # 04 Y:2007 | 04 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $16,549 | $23,640 | Not Implemented |
MI0155 # 05 Y:2007 | 05 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,901 | $27,300 | Not Implemented |
MI0155 # 06 Y:2007 | 06 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $13,760 | $1,074 | Not Implemented |
MI0155 # 07 Y:2007 | 07 | 2007 | USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS | $7,524 | $7,800 | Not Implemented |
MI0155 # 08 Y:2007 | 08 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,179 | $30 | Not Implemented |
MI0155 # 09 Y:2007 | 09 | 2007 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,909 | $180 | Not Implemented |
MI0155 # 10 Y:2007 | 10 | 2007 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $1,610 | $3,010 | Not Implemented |
UU0101 # 01 Y:2006 | 01 | 2006 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $16,190 | $10,000 | Not Implemented |
UU0101 # 02 Y:2006 | 02 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,280 | $4,150 | Not Implemented |
UU0101 # 03 Y:2006 | 03 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,230 | $3,050 | Not Implemented |
UU0101 # 04 Y:2006 | 04 | 2006 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $4,760 | $10,030 | Not Implemented |
UU0101 # 05 Y:2006 | 05 | 2006 | OPTIMIZE PLANT POWER FACTOR | $3,770 | $4,140 | Not Implemented |
UU0101 # 06 Y:2006 | 06 | 2006 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $100,330 | $52,800 | Not Implemented |
LL0208 # 01 Y:2004 | 01 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $36,748 | $166,850 | Not Implemented |
LL0208 # 02 Y:2004 | 02 | 2004 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $18,385 | $1,317 | Not Implemented |
LL0208 # 03 Y:2004 | 03 | 2004 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $16,090 | $6,000 | Not Implemented |
LL0208 # 04 Y:2004 | 04 | 2004 | USE PHOTOCELL CONTROLS | $12,869 | $480 | Not Implemented |
LL0208 # 05 Y:2004 | 05 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,715 | $640 | Not Implemented |
LL0208 # 06 Y:2004 | 06 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,657 | $30 | Not Implemented |
LL0208 # 07 Y:2004 | 07 | 2004 | INSTALL OCCUPANCY SENSORS | $2,585 | $600 | Not Implemented |