IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

27

matching recommendations
Reset
NAICS 311991 Perishable Prepared Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0439 # 02 Y:2003 02 2003 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $79,200 $1,200 Implemented
AM0439 # 01 Y:2003 01 2003 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST $910,000 $435,000 Implemented
AM0439 # 12 Y:2003 12 2003 ELIMINATE LEAKS IN WATER LINES AND VALVES $1,140 $400 Implemented
AM0439 # 11 Y:2003 11 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,290 $1,460 Implemented
AM0439 # 10 Y:2003 10 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,500 $980 Implemented
AM0439 # 09 Y:2003 09 2003 INSULATE BARE EQUIPMENT $4,890 $550 Implemented
AM0439 # 08 Y:2003 08 2003 REPAIR OR REPLACE STEAM TRAPS $7,600 $1,120 Implemented
AM0439 # 07 Y:2003 07 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,400 $1,000 Implemented
AM0439 # 06 Y:2003 06 2003 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $13,200 $7,600 Implemented
AM0439 # 05 Y:2003 05 2003 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $15,600 $500 Implemented
AM0439 # 04 Y:2003 04 2003 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $31,700 $270 Implemented
AM0439 # 03 Y:2003 03 2003 REDUCE OR ELIMINATE WASTE $36,600 $220 Implemented
AS0342 # 15 Y:2003 15 2003 CLEAR AND RENT EXISTING SPACE $168,960 $8,364 Not Implemented
AS0342 # 14 Y:2003 14 2003 $88,920 $1,140 Not Implemented
AS0342 # 13 Y:2003 13 2003 INSTALL AUTOMATIC PACKING EQUIPMENT $15,933 $22,000 n/a
AS0342 # 12 Y:2003 12 2003 INSTALL AUTOMATIC PACKING EQUIPMENT $37,933 $57,000 n/a
AS0342 # 11 Y:2003 11 2003 INSTALL AUTOMATIC PACKING EQUIPMENT $258,120 $14,080 n/a
AS0342 # 10 Y:2003 10 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,251 $387 Not Implemented
AS0342 # 09 Y:2003 09 2003 USE SYNTHETIC LUBRICANT $969 $3,231 Not Implemented
AS0342 # 08 Y:2003 08 2003 INSTALL SKYLIGHTS $751 $1,958 Not Implemented
AS0342 # 07 Y:2003 07 2003 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $3,367 $3,600 Not Implemented
AS0342 # 06 Y:2003 06 2003 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $853 $0 Implemented
AS0342 # 05 Y:2003 05 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,918 $6,084 Not Implemented
AS0342 # 04 Y:2003 04 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $497 $30 Not Implemented
AS0342 # 03 Y:2003 03 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $813 $2,376 Not Implemented