Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
39
matching recommendationsNAICS | 311999 | All Other Miscellaneous Food Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0594 # 01 Y:2023 | 01 | 2023 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $10,580 | $0 | Not Implemented |
SF0594 # 08 Y:2023 | 08 | 2023 | INSULATE BARE EQUIPMENT | $559 | $1,938 | Not Implemented |
SF0594 # 06 Y:2023 | 06 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $18,717 | $13,055 | Not Implemented |
SF0594 # 07 Y:2023 | 07 | 2023 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,385 | $9,100 | Not Implemented |
SF0594 # 04 Y:2023 | 04 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $54,583 | $28,593 | Not Implemented |
SF0594 # 05 Y:2023 | 05 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $7,223 | $4,344 | Not Implemented |
SF0594 # 02 Y:2023 | 02 | 2023 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $10,143 | $0 | Not Implemented |
SF0594 # 03 Y:2023 | 03 | 2023 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $38,807 | $8,920 | Not Implemented |
SF0555 # 03 Y:2020 | 03 | 2020 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $3,734 | $3,930 | Implemented |
SF0555 # 06 Y:2020 | 06 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,764 | $20,616 | Implemented |
SF0555 # 02 Y:2020 | 02 | 2020 | INSULATE BARE EQUIPMENT | $1,257 | $1,080 | Implemented |
SF0555 # 01 Y:2020 | 01 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,084 | $0 | Implemented |
SF0555 # 04 Y:2020 | 04 | 2020 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $450,171 | $750,000 | Not Implemented |
SF0555 # 08 Y:2020 | 08 | 2020 | USE SOLAR HEAT TO MAKE ELECTRICTY | $63,107 | $268,469 | Not Implemented |
SF0555 # 05 Y:2020 | 05 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $26,221 | $33,106 | Implemented |
SF0555 # 07 Y:2020 | 07 | 2020 | REPLACE BOILER | $14,667 | $114,810 | Implemented |
SD0491 # 06 Y:2014 | 06 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $310 | $200 | Implemented |
SD0491 # 05 Y:2014 | 05 | 2014 | USE PHOTOCELL CONTROLS | $445 | $555 | Not Implemented |
SD0491 # 04 Y:2014 | 04 | 2014 | INSTALL OCCUPANCY SENSORS | $609 | $957 | Not Implemented |
SD0491 # 03 Y:2014 | 03 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $924 | $3,450 | Not Implemented |
SD0491 # 02 Y:2014 | 02 | 2014 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $1,726 | $194 | Not Implemented |
SD0491 # 01 Y:2014 | 01 | 2014 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $4,862 | $5,500 | Not Implemented |
SF0443 # 01 Y:2014 | 01 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $169,599 | $40,264 | Implemented |
SF0443 # 02 Y:2014 | 02 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,241 | $840 | Not Implemented |
SF0443 # 03 Y:2014 | 03 | 2014 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,931 | $0 | Not Implemented |