Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
23
matching recommendationsNAICS | 311999 | All Other Miscellaneous Food Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0602 # 10 Y:2020 | 10 | 2020 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $136 | $570 | Implemented |
WV0602 # 09 Y:2020 | 09 | 2020 | DEVELOP A REPAIR/REPLACE POLICY | $154 | $568 | Implemented |
WV0602 # 08 Y:2020 | 08 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $263 | $1,060 | Implemented |
WV0602 # 07 Y:2020 | 07 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $268 | $1,225 | Implemented |
WV0602 # 06 Y:2020 | 06 | 2020 | UPGRADE CONTROLS ON COMPRESSORS | $322 | $299 | Not Implemented |
WV0602 # 05 Y:2020 | 05 | 2020 | UPGRADE CONTROLS ON COMPRESSORS | $743 | $1,348 | Not Implemented |
WV0602 # 04 Y:2020 | 04 | 2020 | INSULATE BARE EQUIPMENT | $1,512 | $2,197 | Implemented |
WV0602 # 03 Y:2020 | 03 | 2020 | INSTALL OCCUPANCY SENSORS | $1,669 | $2,886 | Implemented |
WV0602 # 02 Y:2020 | 02 | 2020 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $4,212 | $8,168 | Not Implemented |
WV0602 # 01 Y:2020 | 01 | 2020 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $5,049 | $3,000 | Implemented |
SF0555 # 07 Y:2020 | 07 | 2020 | REPLACE BOILER | $14,667 | $114,810 | Implemented |
SF0555 # 08 Y:2020 | 08 | 2020 | USE SOLAR HEAT TO MAKE ELECTRICTY | $63,107 | $268,469 | Not Implemented |
SF0555 # 06 Y:2020 | 06 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,764 | $20,616 | Implemented |
SF0555 # 05 Y:2020 | 05 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $26,221 | $33,106 | Implemented |
SF0555 # 04 Y:2020 | 04 | 2020 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $450,171 | $750,000 | Not Implemented |
SF0555 # 03 Y:2020 | 03 | 2020 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $3,734 | $3,930 | Implemented |
SF0555 # 02 Y:2020 | 02 | 2020 | INSULATE BARE EQUIPMENT | $1,257 | $1,080 | Implemented |
SF0555 # 01 Y:2020 | 01 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,084 | $0 | Implemented |
IC0238 # 01 Y:2020 | 01 | 2020 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $31,874 | $24,382 | Not Implemented |
IC0238 # 05 Y:2020 | 05 | 2020 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $979 | $240 | Not Implemented |
IC0238 # 04 Y:2020 | 04 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,791 | $83 | Not Implemented |
IC0238 # 03 Y:2020 | 03 | 2020 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $781 | $1,758 | Not Implemented |
IC0238 # 02 Y:2020 | 02 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $14,907 | $5,000 | Not Implemented |