IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

22

matching recommendations
Reset
NAICS 312 Beverage and Tobacco Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0631 # 02 Y:2014 02 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,168 $5,544 Not Implemented
OR0631 # 03 Y:2014 03 2014 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,567 $1,634 Implemented
OR0631 # 04 Y:2014 04 2014 INSTALL / REPAIR INSULATION ON STEAM LINES $800 $417 Implemented
OR0631 # 01 Y:2014 01 2014 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $11,360 $250 Implemented
UW0050 # 01 Y:2011 01 2011 PAY BILLS ON TIME TO AVOID LATE FEES $0 $0 Implemented
UW0049 # 04 Y:2011 04 2011 INSULATE BARE EQUIPMENT $1,029 $1,810 Not Implemented
UW0049 # 03 Y:2011 03 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,756 $1,300 Implemented
UW0049 # 02 Y:2011 02 2011 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $9,443 $7,200 Implemented
UW0049 # 01 Y:2011 01 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,931 $67,308 Not Implemented
UW0047 # 01 Y:2011 01 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,466 $57,117 Not Implemented
UW0047 # 02 Y:2011 02 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,626 $11,606 Not Implemented
UW0047 # 03 Y:2011 03 2011 INSULATE BARE EQUIPMENT $400 $410 Not Implemented
UW0038 # 01 Y:2010 01 2010 INSULATE BARE EQUIPMENT $53,335 $266,675 Not Implemented
UW0038 # 02 Y:2010 02 2010 IMPROVE COMBUSTION CONTROL CAPABILITY $51,000 $140,000 Not Implemented
UW0038 # 03 Y:2010 03 2010 INSULATE BARE EQUIPMENT $3,375 $1,675 Not Implemented
UW0011 # 01 Y:2008 01 2008 REPLACE BOILER $8,882 $23,870 Not Implemented
UW0011 # 02 Y:2008 02 2008 INSULATE BARE EQUIPMENT $7,908 $15,906 Not Implemented
UW0011 # 07 Y:2008 07 2008 INSTALL OCCUPANCY SENSORS $1,476 $300 Not Implemented
UW0011 # 06 Y:2008 06 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,444 $0 Not Implemented
UW0011 # 05 Y:2008 05 2008 INSTALL SKYLIGHTS $5,089 $26,250 Not Implemented
UW0011 # 04 Y:2008 04 2008 USE SOLAR HEAT TO HEAT WATER $5,523 $20,275 Not Implemented
UW0011 # 03 Y:2008 03 2008 SELL COMBUSTIBLE WASTE $5,774 $0 Not Implemented