IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

130

matching recommendations
Reset
NAICS 312 Beverage and Tobacco Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0983 # 02 Y:2018 02 2018 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $13,719 $2,500 Not Implemented
UD0983 # 03 Y:2018 03 2018 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $1,019 $4,500 Not Implemented
UD0983 # 04 Y:2018 04 2018 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $4,393 $6,000 Not Implemented
UD0983 # 05 Y:2018 05 2018 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,115 $0 Implemented
UD0983 # 06 Y:2018 06 2018 USE OPTIMUM TEMPERATURE $836 $0 Not Implemented
UD0983 # 07 Y:2018 07 2018 INSTALL / REPAIR INSULATION ON STEAM LINES $819 $1,100 Implemented
UD0983 # 08 Y:2018 08 2018 USE OPTIMUM TEMPERATURE $355 $0 Implemented
AS0450 # 01 Y:2018 01 2018 UTILIZE A LESS EXPENSIVE COOLING METHOD $35,156 $4,000 Not Implemented
AS0450 # 02 Y:2018 02 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $22,239 $400 Not Implemented
AS0450 # 03 Y:2018 03 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,775 $3,994 Implemented
AS0450 # 04 Y:2018 04 2018 AVOID FROST FORMATION ON EVAPORATORS $865 $195 Not Implemented
LS1803 # 01 Y:2018 01 2018 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $544 $220 Implemented
LS1803 # 02 Y:2018 02 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $437 $300 Not Implemented
LS1803 # 03 Y:2018 03 2018 INSULATE BARE EQUIPMENT $179 $156 Not Implemented
LS1803 # 04 Y:2018 04 2018 ELIMINATE/REDUCE AN OPERATION $600 $620 Not Implemented
LS1803 # 05 Y:2018 05 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $39 $95 Not Implemented
LS1803 # 06 Y:2018 06 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $577 $2,755 Implemented
LS1803 # 07 Y:2018 07 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $228 $1,800 Not Implemented
SD0559 # 01 Y:2018 01 2018 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $534,492 $1,824,000 Not Implemented
SD0559 # 02 Y:2018 02 2018 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $46,211 $152,126 Not Implemented
SD0559 # 03 Y:2018 03 2018 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $21,481 $37,900 Not Implemented
SD0559 # 04 Y:2018 04 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,884 $14,697 Not Implemented
SD0559 # 05 Y:2018 05 2018 REDUCE EXCESSIVE BOILER BLOWDOWN $8,114 $11,774 Not Implemented
SD0559 # 06 Y:2018 06 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,587 $600 Not Implemented
MA0786 # 01 Y:2018 01 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $36,650 $11,256 Not Implemented