IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

37

matching recommendations
Reset
NAICS 3121 Beverage Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0166 # 01 Y:2022 01 2022 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $12,766 $0 Not Implemented
IP0166 # 02 Y:2022 02 2022 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $4,102 $0 Not Implemented
IP0166 # 12 Y:2022 12 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $136 $665 Implemented
IP0166 # 08 Y:2022 08 2022 RECOVER WASTE HEAT FROM EQUIPMENT $704 $1,279 Not Implemented
IP0166 # 09 Y:2022 09 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $198 $416 Implemented
IP0166 # 03 Y:2022 03 2022 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $9,132 $0 Not Implemented
IP0166 # 04 Y:2022 04 2022 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,623 $0 Implemented
IP0166 # 06 Y:2022 06 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,625 $3,274 Implemented
IP0166 # 11 Y:2022 11 2022 OPTIMIZE PLANT POWER FACTOR $11,046 $43,200 Implemented
IP0166 # 07 Y:2022 07 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,433 $1,162 Implemented
IP0166 # 10 Y:2022 10 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $279 $665 Implemented
IP0166 # 05 Y:2022 05 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $526 $33 Implemented
IC0231 # 02 Y:2020 02 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,285 $6,673 Implemented
IC0231 # 05 Y:2020 05 2020 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $5,416 $0 Implemented
IC0231 # 04 Y:2020 04 2020 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $12,061 $2,400 Not Implemented
IC0231 # 03 Y:2020 03 2020 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $5,211 $50,440 Implemented
IC0231 # 01 Y:2020 01 2020 OPTIMIZE PLANT POWER FACTOR $15,040 $26,145 Implemented
IC0212 # 01 Y:2019 01 2019 BASE UTILITY CHARGES ON USAGE RATHER THAN AREA OCCUPIED $59,063 $2,920 Implemented
IC0212 # 03 Y:2019 03 2019 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $5,487 $10,350 Not Implemented
IC0212 # 02 Y:2019 02 2019 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $19,906 $53,007 Not Implemented
IP0051 # 08 Y:2015 08 2015 OPTIMIZE PLANT POWER FACTOR $4,646 $12,637 Not Implemented
IP0051 # 06 Y:2015 06 2015 RECOVER WASTE HEAT FROM EQUIPMENT $2,349 $2,149 Not Implemented
IP0051 # 05 Y:2015 05 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,713 $534 Not Implemented
IP0051 # 04 Y:2015 04 2015 RECYCLE WHITE WATER $1,246 $108 Implemented
IP0051 # 03 Y:2015 03 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,313 $261 Implemented