IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,879

matching recommendations
Reset
NAICS 3121 Beverage Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0188 # 07 Y:2021 07 2021 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $1,320 $8,000 Not Implemented
DL0188 # 08 Y:2021 08 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $19,340 $48,750 Not Implemented
DL0188 # 09 Y:2021 09 2021 RECOVER WASTE HEAT FROM EQUIPMENT $7,620 $7,000 Not Implemented
DL0188 # 10 Y:2021 10 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $17,490 $25,000 Implemented
DL0188 # 11 Y:2021 11 2021 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $3,150 $4,600 Not Implemented
DL0188 # 12 Y:2021 12 2021 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $25,290 $57,350 Implemented
DL0188 # 13 Y:2021 13 2021 RECOVER WASTE HEAT FROM EQUIPMENT $6,000 $5,500 Not Implemented
DL0188 # 14 Y:2021 14 2021 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $11,800 $9,120 Not Implemented
GT0953 # 01 Y:2020 01 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,717 $1,850 Implemented
GT0953 # 02 Y:2020 02 2020 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $2,292 $800 Implemented
GT0953 # 03 Y:2020 03 2020 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,025 $400 Implemented
GT0953 # 04 Y:2020 04 2020 INSTALL TIMERS AND/OR THERMOSTATS $229 $113 Implemented
GT0953 # 05 Y:2020 05 2020 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $8,558 $8,050 Implemented
GT0953 # 06 Y:2020 06 2020 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $38,010 $172,500 Implemented
UK2005 # 01 Y:2021 01 2021 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $2,303 $5,660 n/a
UK2005 # 02 Y:2021 02 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $802 $0 n/a
UK2005 # 03 Y:2021 03 2021 USE RADIANT HEATER FOR SPOT HEATING $5,104 $3,740 n/a
UK2005 # 04 Y:2021 04 2021 UPGRADE CONTROLS ON COMPRESSORS $9,505 $5,250 n/a
UK2005 # 05 Y:2021 05 2021 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $6,176 $80 n/a
UK2005 # 06 Y:2021 06 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,065 $3,580 n/a
UK2005 # 07 Y:2021 07 2021 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $21,605 $3,000 n/a
UK2005 # 08 Y:2021 08 2021 PREHEAT COMBUSTION AIR WITH WASTE HEAT $66,411 $240,000 n/a
UK2005 # 09 Y:2021 09 2021 INSULATE BARE EQUIPMENT $4,993 $6,721 n/a
UF0556 # 01 Y:2020 01 2020 USE SOLAR HEAT TO MAKE ELECTRICTY $33,420 $174,290 Implemented
UF0556 # 02 Y:2020 02 2020 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $4,365 $10,575 Not Implemented