IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

193

matching recommendations
Reset
NAICS 3121 Beverage Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0550 # 03 Y:2020 03 2020 INSTALL TURBULATORS $3,921 $11,250 Implemented
UF0550 # 04 Y:2020 04 2020 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,928 $2,800 Implemented
MI0350 # 13 Y:2019 13 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,052 $80 Implemented
MI0350 # 12 Y:2019 12 2019 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $2,203 $410 Implemented
MI0350 # 11 Y:2019 11 2019 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,540 $6,160 Not Implemented
MI0350 # 08 Y:2019 08 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $12,352 $3,860 Not Implemented
MI0350 # 07 Y:2019 07 2019 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $18,627 $1,126 Implemented
MI0350 # 06 Y:2019 06 2019 ADD AIR SHIELDS TO TRUCKS TO INCREASE FUEL MILEAGE $18,916 $13,100 Not Implemented
MI0350 # 05 Y:2019 05 2019 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $21,816 $46,090 Not Implemented
MI0350 # 10 Y:2019 10 2019 INCREASE EFFICIENCY OF TRUCKS $6,123 $5,800 Not Implemented
MI0350 # 09 Y:2019 09 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,638 $200 Not Implemented
MI0350 # 04 Y:2019 04 2019 INSULATE BARE EQUIPMENT $36,067 $25,990 Not Implemented
MI0350 # 03 Y:2019 03 2019 USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS $65,500 $142,400 Not Implemented
MI0350 # 02 Y:2019 02 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $137,608 $23,779 Implemented
MI0350 # 01 Y:2019 01 2019 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $234,952 $172,151 Implemented
MI0332 # 01 Y:2018 01 2018 TURN OFF EQUIPMENT WHEN NOT IN USE $37,879 $3,280 Implemented
MI0332 # 04 Y:2018 04 2018 INCREASE EFFICIENCY OF TRUCKS $17,850 $31,926 Not Implemented
MI0332 # 10 Y:2018 10 2018 INSTALL OCCUPANCY SENSORS $768 $2,041 Implemented
MI0332 # 09 Y:2018 09 2018 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,178 $480 Not Implemented
MI0332 # 02 Y:2018 02 2018 MINIMIZE WATER USAGE $30,000 $5,400 Implemented
MI0332 # 06 Y:2018 06 2018 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $3,193 $568 Implemented
MI0332 # 08 Y:2018 08 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,047 $5,203 Implemented
MI0332 # 03 Y:2018 03 2018 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $29,437 $39,837 Implemented
MI0332 # 05 Y:2018 05 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,738 $15,667 Implemented
MI0332 # 07 Y:2018 07 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,127 $1,980 Not Implemented