Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
452
matching recommendationsNAICS | 3121 | Beverage Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SD0612 # 08 Y:2021 | 08 | 2021 | REPAIR AND ELIMINATE STEAM LEAKS | $557 | $1,000 | Implemented |
SD0612 # 07 Y:2021 | 07 | 2021 | RECOVER WASTE HEAT FROM EQUIPMENT | $14,829 | $44,568 | Not Implemented |
SD0612 # 06 Y:2021 | 06 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,883 | $2,800 | Not Implemented |
SD0612 # 05 Y:2021 | 05 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,530 | $9,245 | Not Implemented |
SD0612 # 04 Y:2021 | 04 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $957 | $0 | Implemented |
SD0612 # 03 Y:2021 | 03 | 2021 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $4,826 | $9,545 | Implemented |
SD0612 # 02 Y:2021 | 02 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,879 | $12,356 | Implemented |
SD0612 # 01 Y:2021 | 01 | 2021 | REDESIGN PROCESS | $39,942 | $13,000 | Implemented |
SF0570 # 10 Y:2021 | 10 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,784 | $27,535 | Not Implemented |
SF0570 # 01 Y:2021 | 01 | 2021 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $24,674 | $0 | Implemented |
SF0570 # 02 Y:2021 | 02 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $27,893 | $0 | Implemented |
SF0570 # 03 Y:2021 | 03 | 2021 | SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS | $149,399 | $10,195 | Implemented |
SF0570 # 04 Y:2021 | 04 | 2021 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $71,549 | $5,641 | Implemented |
SF0570 # 05 Y:2021 | 05 | 2021 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $106,544 | $31,500 | Not Implemented |
SF0570 # 07 Y:2021 | 07 | 2021 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $39,174 | $48,150 | Not Implemented |
SF0570 # 08 Y:2021 | 08 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,387 | $6,315 | Implemented |
SF0570 # 09 Y:2021 | 09 | 2021 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $291 | $648 | Implemented |
SF0570 # 11 Y:2021 | 11 | 2021 | USE SOLAR HEAT TO MAKE ELECTRICTY | $179,262 | $1,269,472 | Implemented |
SF0570 # 06 Y:2021 | 06 | 2021 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $514 | $190 | Not Implemented |
SF0569 # 07 Y:2021 | 07 | 2021 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $143,550 | $77,720 | Implemented |
SF0569 # 06 Y:2021 | 06 | 2021 | USE SOLAR HEAT TO MAKE ELECTRICTY | $107,546 | $722,227 | Implemented |
SF0569 # 05 Y:2021 | 05 | 2021 | INSTALL OCCUPANCY SENSORS | $2,279 | $6,956 | Implemented |
SF0569 # 04 Y:2021 | 04 | 2021 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $7,674 | $23,650 | Implemented |
SF0569 # 03 Y:2021 | 03 | 2021 | SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS | $5,693 | $9,138 | Implemented |
SF0569 # 02 Y:2021 | 02 | 2021 | INSTALL TIMERS AND/OR THERMOSTATS | $4,698 | $3,740 | Implemented |