Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,033
matching recommendationsNAICS | 3121 | Beverage Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
BS0097 # 02 Y:2017 | 02 | 2017 | TREAT AND REUSE RINSE WATERS | $870 | $8,674 | Not Implemented |
BS0097 # 03 Y:2017 | 03 | 2017 | USE SOLAR HEAT TO MAKE ELECTRICTY | $6,781 | $127,800 | Not Implemented |
BS0097 # 04 Y:2017 | 04 | 2017 | TREAT AND REUSE EQUIPMENT CLEANING SOLUTIONS | $751 | $5,250 | Not Implemented |
BS0097 # 05 Y:2017 | 05 | 2017 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $319 | $2,189 | Not Implemented |
BS0097 # 06 Y:2017 | 06 | 2017 | ADOPT IN-HOUSE MATERIAL GENERATION | $3,137 | $60,000 | Not Implemented |
BS0097 # 07 Y:2017 | 07 | 2017 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $236 | $131 | Not Implemented |
BS0097 # 08 Y:2017 | 08 | 2017 | INSTALL OCCUPANCY SENSORS | $212 | $277 | Not Implemented |
BS0097 # 09 Y:2017 | 09 | 2017 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $140 | $160 | Not Implemented |
UU0115 # 01 Y:2017 | 01 | 2017 | DISCONNECT BALLASTS | $296 | $0 | Implemented |
UU0115 # 02 Y:2017 | 02 | 2017 | INSTALL OCCUPANCY SENSORS | $444 | $438 | Implemented |
UU0115 # 03 Y:2017 | 03 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,840 | $0 | Implemented |
UU0115 # 04 Y:2017 | 04 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $931 | $2,500 | Not Implemented |
UU0115 # 05 Y:2017 | 05 | 2017 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $8,766 | $0 | Implemented |
AM0723 # 01 Y:2017 | 01 | 2017 | OPTIMIZE PLANT POWER FACTOR | $12,900 | $23,700 | Implemented |
AM0723 # 02 Y:2017 | 02 | 2017 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $12,700 | $0 | Not Implemented |
AM0723 # 03 Y:2017 | 03 | 2017 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $8,600 | $340 | Implemented |
AM0723 # 04 Y:2017 | 04 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,230 | $2,500 | Implemented |
AM0723 # 05 Y:2017 | 05 | 2017 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $10,380 | $3,000 | Implemented |
AM0723 # 06 Y:2017 | 06 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,260 | $3,480 | Not Implemented |
AM0723 # 07 Y:2017 | 07 | 2017 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $3,200 | $0 | Implemented |
AM0723 # 08 Y:2017 | 08 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,230 | $4,350 | Implemented |
AM0723 # 09 Y:2017 | 09 | 2017 | USE SYNTHETIC LUBRICANT | $860 | $0 | Not Implemented |
AM0723 # 10 Y:2017 | 10 | 2017 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $580 | $980 | Not Implemented |
OR0682 # 01 Y:2017 | 01 | 2017 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $104,297 | $70,000 | Not Implemented |
OR0682 # 02 Y:2017 | 02 | 2017 | REPLACE BOILER | $4,289 | $23,625 | Not Implemented |