IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,875

matching recommendations
Reset
NAICS 3121 Beverage Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0598 # 02 Y:2023 02 2023 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $3,805 $1,551 Implemented
SF0598 # 01 Y:2023 01 2023 USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE $10,131 $0 Implemented
DL0219 # 01 Y:2023 01 2023 AIR CONDITION ONLY SPACE NECESSARY $496 $0 Implemented
DL0219 # 02 Y:2023 02 2023 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $922 $520 Not Implemented
DL0219 # 03 Y:2023 03 2023 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $6,246 $4,000 Not Implemented
DL0219 # 04 Y:2023 04 2023 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $5,827 $0 Implemented
DL0219 # 05 Y:2023 05 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,974 $10,600 Implemented
DL0219 # 06 Y:2023 06 2023 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT $11,196 $50,000 Implemented
DL0219 # 07 Y:2023 07 2023 USE COOLING AIR WHICH COOLS HOT WORK PIECES FOR SPACE HEATING $2,856 $16,145 Not Implemented
DL0219 # 08 Y:2023 08 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,178 $10,128 Implemented
DL0219 # 09 Y:2023 09 2023 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $51,679 $50,000 Not Implemented
MA0851 # 07 Y:2023 07 2023 AVOID FROST FORMATION ON EVAPORATORS $434 $216 Implemented
MA0851 # 06 Y:2023 06 2023 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,544 $5,977 Implemented
MA0851 # 05 Y:2023 05 2023 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $5,872 $20,925 Not Implemented
MA0851 # 04 Y:2023 04 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $18,230 $3,215 Not Implemented
MA0851 # 03 Y:2023 03 2023 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $28,576 $1,000 Implemented
MA0851 # 02 Y:2023 02 2023 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $43,839 $169,678 Not Implemented
MA0851 # 01 Y:2023 01 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $135,448 $385,041 Implemented
MA0850 # 06 Y:2023 06 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $589 $625 Not Implemented
MA0850 # 05 Y:2023 05 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,345 $8,021 Not Implemented
MA0850 # 04 Y:2023 04 2023 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $18,844 $1,000 Implemented
MA0850 # 03 Y:2023 03 2023 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,634 $1,500 Not Implemented
MA0850 # 02 Y:2023 02 2023 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $7,420 $2,484 Not Implemented
MA0850 # 01 Y:2023 01 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $178,027 $784,209 Not Implemented
SF0596 # 04 Y:2023 04 2023 INSULATE BARE EQUIPMENT $1,185 $2,397 Implemented