IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

54

matching recommendations
Reset
NAICS 3121 Beverage Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0737 # 06 Y:2021 06 2021 INSTALL OCCUPANCY SENSORS $276 $723 Not Implemented
CO0737 # 02 Y:2021 02 2021 USE SOLAR HEAT TO MAKE ELECTRICTY $1,867 $5,500 Implemented
CO0737 # 05 Y:2021 05 2021 ELIMINATE/REDUCE AN OPERATION $12,333 $94,800 Implemented
CO0737 # 03 Y:2021 03 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,685 $3,756 Implemented
CO0737 # 01 Y:2021 01 2021 USE BATTERY STORAGE FOR DEMAND CONTROL $10,391 $42,800 Implemented
CO0737 # 04 Y:2021 04 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,196 $200 Implemented
UU0147 # 05 Y:2019 05 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,081 $1,800 Implemented
UU0147 # 04 Y:2019 04 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,746 $1,200 Implemented
UU0147 # 03 Y:2019 03 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,684 $7,000 Implemented
UU0147 # 02 Y:2019 02 2019 USE OPTIMUM THICKNESS INSULATION $3,521 $2,917 Implemented
UU0147 # 01 Y:2019 01 2019 USE A DIFFERENT OR RECYCLED RAW MATERIAL $54,000 $300,000 Not Implemented
UU0147 # 06 Y:2019 06 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $130 $0 Implemented
UU0147 # 07 Y:2019 07 2019 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $433 $400 Implemented
UU0146 # 07 Y:2019 07 2019 USE COOLING AIR WHICH COOLS HOT WORK PIECES FOR SPACE HEATING $367 $1,200 Not Implemented
UU0146 # 08 Y:2019 08 2019 USE DOUBLE OR TRIPLE GLAZED WINDOWS TO MAINTAIN HIGHER RELATIVE HUMIDITY AND TO REDUCE HEAT LOSSES $231 $1,100 Not Implemented
UU0146 # 09 Y:2019 09 2019 REPLACE AIR CURTAIN DOORS WITH SOLID DOORS $97 $75 Implemented
UU0146 # 02 Y:2019 02 2019 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $2,186 $2,000 Not Implemented
UU0146 # 03 Y:2019 03 2019 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $1,780 $0 Implemented
UU0146 # 04 Y:2019 04 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,035 $350 Not Implemented
UU0146 # 05 Y:2019 05 2019 INSTALL / REPAIR INSULATION ON STEAM LINES $850 $0 Not Implemented
UU0146 # 06 Y:2019 06 2019 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $693 $2,575 Not Implemented
UU0146 # 10 Y:2019 10 2019 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $3,482 $1,000 Not Implemented
UU0146 # 01 Y:2019 01 2019 USE A DIFFERENT OR RECYCLED RAW MATERIAL $37,500 $225,000 Not Implemented
CO0688 # 02 Y:2014 02 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,390 $1,500 Implemented
CO0688 # 05 Y:2014 05 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,160 $3,140 Not Implemented