IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

24

matching recommendations
Reset
NAICS 3121 Beverage Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0303 # 06 Y:2024 06 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $972 $38 n/a
IC0303 # 17 Y:2024 17 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,739 $211 n/a
IC0303 # 16 Y:2024 16 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $74,328 $441,248 n/a
IC0303 # 15 Y:2024 15 2024 INSULATE BARE EQUIPMENT $2,406 $1,236 n/a
IC0303 # 14 Y:2024 14 2024 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $774 $36 n/a
IC0303 # 13 Y:2024 13 2024 REPAIR OR REPLACE STEAM TRAPS $3,324 $1,624 n/a
IC0303 # 12 Y:2024 12 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,947 $546 n/a
IC0303 # 11 Y:2024 11 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,164 $0 n/a
IC0303 # 10 Y:2024 10 2024 INSULATE BARE EQUIPMENT $2,366 $843 n/a
IC0303 # 09 Y:2024 09 2024 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,399 $4,154 n/a
IC0303 # 08 Y:2024 08 2024 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $19,438 $3,433 n/a
IC0303 # 07 Y:2024 07 2024 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $182 $328 n/a
IC0303 # 05 Y:2024 05 2024 USE DIRECT FLAME IMPINGEMENT OR INFRARED PROCESSING FOR CHAMBER TYPE HEATING $31,214 $13,640 n/a
IC0303 # 04 Y:2024 04 2024 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $475 $0 n/a
IC0303 # 03 Y:2024 03 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $750 $0 n/a
IC0303 # 02 Y:2024 02 2024 USE DEMAND CONTROLLER OR LOAD SHEDDER $1,368 $3,859 n/a
IC0303 # 01 Y:2024 01 2024 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $2,502 $3,692 n/a
BD0404 # 01 Y:2012 01 2012 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $49,969 $32,000 Not Implemented
BD0404 # 07 Y:2012 07 2012 REPAIR AND ELIMINATE STEAM LEAKS $1,669 $100 Implemented
BD0404 # 06 Y:2012 06 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,573 $1,500 Implemented
BD0404 # 05 Y:2012 05 2012 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $6,137 $20 Implemented
BD0404 # 04 Y:2012 04 2012 INSTALL OCCUPANCY SENSORS $4,130 $8,000 Implemented
BD0404 # 03 Y:2012 03 2012 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $28,023 $25,000 Not Implemented
BD0404 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $31,392 $76,240 Implemented