Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
19
matching recommendationsNAICS | 3121 | Beverage Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0311 # 09 Y:2017 | 09 | 2017 | INSTALL OCCUPANCY SENSORS | $889 | $1,320 | Implemented |
MI0311 # 08 Y:2017 | 08 | 2017 | USE PHOTOCELL CONTROLS | $938 | $342 | Implemented |
MI0311 # 07 Y:2017 | 07 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,449 | $10,720 | Implemented |
MI0311 # 06 Y:2017 | 06 | 2017 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $19,177 | $1,440 | Implemented |
MI0311 # 05 Y:2017 | 05 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $21,644 | $21,418 | Implemented |
MI0311 # 04 Y:2017 | 04 | 2017 | OPTIMIZE PLANT POWER FACTOR | $27,970 | $22,300 | Not Implemented |
MI0311 # 03 Y:2017 | 03 | 2017 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $28,589 | $4,520 | Implemented |
MI0311 # 02 Y:2017 | 02 | 2017 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $33,524 | $10,000 | Not Implemented |
MI0311 # 01 Y:2017 | 01 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $97,830 | $1,660 | Implemented |
MI0302 # 10 Y:2016 | 10 | 2016 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $521 | $116 | Not Implemented |
MI0302 # 01 Y:2016 | 01 | 2016 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $12,170 | $29,740 | Implemented |
MI0302 # 09 Y:2016 | 09 | 2016 | AIR CONDITION ONLY SPACE NECESSARY | $1,008 | $160 | Implemented |
MI0302 # 08 Y:2016 | 08 | 2016 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,335 | $416 | Implemented |
MI0302 # 07 Y:2016 | 07 | 2016 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $2,023 | $3,200 | Not Implemented |
MI0302 # 06 Y:2016 | 06 | 2016 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $2,171 | $260 | Not Implemented |
MI0302 # 05 Y:2016 | 05 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,711 | $2,387 | Implemented |
MI0302 # 04 Y:2016 | 04 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,652 | $4,744 | Implemented |
MI0302 # 03 Y:2016 | 03 | 2016 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $4,045 | $11,648 | Not Implemented |
MI0302 # 02 Y:2016 | 02 | 2016 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $4,840 | $940 | Implemented |