Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
40
matching recommendationsNAICS | 3121 | Beverage Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UW2414 # 04 Y:2024 | 04 | 2024 | ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION | $92,758 | $115,000 | n/a |
UW2414 # 03 Y:2024 | 03 | 2024 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $812 | $1,219 | n/a |
UW2414 # 11 Y:2024 | 11 | 2024 | USE OTHER METHODS FOR NEUTRALIZATION | $13,133 | $58,000 | n/a |
UW2414 # 02 Y:2024 | 02 | 2024 | REDUCE DEFECTS BY REDUCING PRODUCT TIPPING | $16,683 | $96,069 | n/a |
UW2414 # 01 Y:2024 | 01 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $141 | $220 | n/a |
UW2414 # 08 Y:2024 | 08 | 2024 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $24,539 | $52,000 | n/a |
UW2414 # 09 Y:2024 | 09 | 2024 | PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST | $252,286 | $90,000 | n/a |
UW2414 # 06 Y:2024 | 06 | 2024 | ADOPT IN-HOUSE MATERIAL GENERATION | $36,181 | $110,000 | n/a |
UW2414 # 05 Y:2024 | 05 | 2024 | LEVEL THREE - INSTALL OR MODIFY CONTROL SYSTEM WITH COMMUNICATION AND NONLOCAL EXTERNAL INFORMATION (I.E. WEATHER FORECA | $57,690 | $7,906 | n/a |
UW2414 # 07 Y:2024 | 07 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $37,019 | $162,415 | n/a |
UW2414 # 10 Y:2024 | 10 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,737 | $25,000 | n/a |
UW2409 # 04 Y:2024 | 04 | 2024 | LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT | $16,446 | $18,600 | n/a |
UW2409 # 03 Y:2024 | 03 | 2024 | TREAT AND REUSE RINSE WATERS | $1,034,601 | $300,000 | n/a |
UW2409 # 02 Y:2024 | 02 | 2024 | REPAIR AND ELIMINATE STEAM LEAKS | $1,927 | $2,080 | n/a |
UW2409 # 01 Y:2024 | 01 | 2024 | REPAIR OR REPLACE STEAM TRAPS | $240,871 | $7,750 | n/a |
UW2409 # 05 Y:2024 | 05 | 2024 | REPLACE BOILER | $61,679 | $155,400 | n/a |
UW2409 # 06 Y:2024 | 06 | 2024 | CROSS-TRAIN PERSONNEL TO AVOID LOST TIME | $72,261 | $271,830 | n/a |
UW2409 # 07 Y:2024 | 07 | 2024 | INSTALL DE-AERATOR IN PLACE OF CONDENSATE TANK | $24,670 | $223,625 | n/a |
OR0631 # 04 Y:2014 | 04 | 2014 | INSTALL / REPAIR INSULATION ON STEAM LINES | $800 | $417 | Implemented |
OR0631 # 03 Y:2014 | 03 | 2014 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,567 | $1,634 | Implemented |
OR0631 # 02 Y:2014 | 02 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,168 | $5,544 | Not Implemented |
OR0631 # 01 Y:2014 | 01 | 2014 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $11,360 | $250 | Implemented |
UW0050 # 01 Y:2011 | 01 | 2011 | PAY BILLS ON TIME TO AVOID LATE FEES | $0 | $0 | Implemented |
UW0049 # 01 Y:2011 | 01 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $16,931 | $67,308 | Not Implemented |
UW0049 # 03 Y:2011 | 03 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,756 | $1,300 | Implemented |