IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

51

matching recommendations
Reset
NAICS 3121 Beverage Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0579 # 11 Y:2005 11 2005 USE SOLAR HEAT TO HEAT MAKE-UP AIR $100 $850 Not Implemented
CO0579 # 01 Y:2005 01 2005 TREAT AND REUSE RINSE WATERS $5,020 $8,800 Not Implemented
CO0579 # 02 Y:2005 02 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,640 $300 Implemented
CO0579 # 03 Y:2005 03 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $526 $718 Implemented
CO0579 # 04 Y:2005 04 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,970 $400 Implemented
CO0579 # 05 Y:2005 05 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,140 $3,200 Not Implemented
CO0579 # 06 Y:2005 06 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $570 $230 Not Implemented
CO0579 # 07 Y:2005 07 2005 UPGRADE CONTROLS ON COMPRESSORS $280 $380 Implemented
CO0579 # 08 Y:2005 08 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,010 $11,780 Not Implemented
CO0579 # 09 Y:2005 09 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,840 $11,540 Not Implemented
CO0579 # 10 Y:2005 10 2005 USE SOLAR HEAT TO HEAT WATER $1,380 $5,220 Implemented
UF0369 # 07 Y:2005 07 2005 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $5,189 $5,000 Not Implemented
UF0369 # 01 Y:2005 01 2005 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,002 $2,082 Implemented
UF0369 # 02 Y:2005 02 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,073 $460 Implemented
UF0369 # 08 Y:2005 08 2005 $0 $0 Not Implemented
UF0369 # 04 Y:2005 04 2005 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $0 $24,800 Implemented
UF0369 # 05 Y:2005 05 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,520 $0 Not Implemented
UF0369 # 06 Y:2005 06 2005 REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF $2,471 $900 Not Implemented
UF0369 # 03 Y:2005 03 2005 INSULATE BARE EQUIPMENT $21,928 $477 Implemented
UF0367 # 01 Y:2005 01 2005 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $124 $0 Implemented
UF0367 # 04 Y:2005 04 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,578 $0 Implemented
UF0367 # 02 Y:2005 02 2005 TURN OFF EQUIPMENT WHEN NOT IN USE $200 $0 Not Implemented
UF0367 # 06 Y:2005 06 2005 ELIMINATE A BY-PRODUCT $426 $300 Not Implemented
UF0367 # 05 Y:2005 05 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,614 $3,948 Implemented
UF0367 # 07 Y:2005 07 2005 INSULATE BARE EQUIPMENT $1,974 $700 Implemented