IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

105

matching recommendations
Reset
NAICS 3121 Beverage Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0150 # 09 Y:2008 09 2008 REPAIR AND ELIMINATE STEAM LEAKS $8,494 $3,000 Not Implemented
IC0150 # 07 Y:2008 07 2008 REPAIR OR REPLACE STEAM TRAPS $71,867 $2,470 Not Implemented
IC0150 # 08 Y:2008 08 2008 USE SOLAR HEAT TO HEAT WATER $468 $4,411 Not Implemented
IC0150 # 06 Y:2008 06 2008 INSTALL / REPAIR INSULATION ON STEAM LINES $21,400 $8,021 Not Implemented
IC0150 # 05 Y:2008 05 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $27,921 $6,440 Not Implemented
IC0150 # 03 Y:2008 03 2008 TURN OFF STEAM TRACING DURING MILD WEATHER $229 $229 Not Implemented
IC0150 # 04 Y:2008 04 2008 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $26,630 $0 Not Implemented
IC0150 # 01 Y:2008 01 2008 BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT $391,205 $3,038,750 Not Implemented
IC0150 # 02 Y:2008 02 2008 REPAIR AND ELIMINATE STEAM LEAKS $1,054 $2,900 Not Implemented
IC0150 # 10 Y:2008 10 2008 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $246,428 $26,100 Not Implemented
SF0363 # 03 Y:2008 03 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,754 $3,506 Implemented
SF0363 # 04 Y:2008 04 2008 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $6,525 $14,831 Not Implemented
SF0363 # 01 Y:2008 01 2008 REPAIR AND ELIMINATE STEAM LEAKS $2,927 $0 Implemented
DL0024 # 01 Y:2008 01 2008 RECOVER WASTE HEAT FROM EQUIPMENT $160,536 $150,000 Not Implemented
SF0363 # 05 Y:2008 05 2008 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $9,481 $69,656 Not Implemented
SF0363 # 02 Y:2008 02 2008 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $968 $1,145 Implemented
DL0024 # 06 Y:2008 06 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $37,200 $112,000 Implemented
DL0024 # 05 Y:2008 05 2008 REPAIR AND ELIMINATE STEAM LEAKS $10,800 $1,200 Implemented
DL0024 # 04 Y:2008 04 2008 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $12,421 $3,877 Not Implemented
DL0024 # 03 Y:2008 03 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $21,865 $11,000 Implemented
DL0024 # 02 Y:2008 02 2008 REPLACE BOILER $116,210 $102,000 Not Implemented
DL0015 # 06 Y:2008 06 2008 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $14,000 $16,000 Not Implemented
DL0015 # 07 Y:2008 07 2008 REPLACE BOILER $13,000 $20,000 Not Implemented
DL0015 # 02 Y:2008 02 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,400 $3,500 Implemented
DL0015 # 05 Y:2008 05 2008 INSTALL / REPAIR INSULATION ON STEAM LINES $5,911 $2,500 Implemented