Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
105
matching recommendationsNAICS | 3121 | Beverage Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IC0150 # 09 Y:2008 | 09 | 2008 | REPAIR AND ELIMINATE STEAM LEAKS | $8,494 | $3,000 | Not Implemented |
IC0150 # 07 Y:2008 | 07 | 2008 | REPAIR OR REPLACE STEAM TRAPS | $71,867 | $2,470 | Not Implemented |
IC0150 # 08 Y:2008 | 08 | 2008 | USE SOLAR HEAT TO HEAT WATER | $468 | $4,411 | Not Implemented |
IC0150 # 06 Y:2008 | 06 | 2008 | INSTALL / REPAIR INSULATION ON STEAM LINES | $21,400 | $8,021 | Not Implemented |
IC0150 # 05 Y:2008 | 05 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $27,921 | $6,440 | Not Implemented |
IC0150 # 03 Y:2008 | 03 | 2008 | TURN OFF STEAM TRACING DURING MILD WEATHER | $229 | $229 | Not Implemented |
IC0150 # 04 Y:2008 | 04 | 2008 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $26,630 | $0 | Not Implemented |
IC0150 # 01 Y:2008 | 01 | 2008 | BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT | $391,205 | $3,038,750 | Not Implemented |
IC0150 # 02 Y:2008 | 02 | 2008 | REPAIR AND ELIMINATE STEAM LEAKS | $1,054 | $2,900 | Not Implemented |
IC0150 # 10 Y:2008 | 10 | 2008 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $246,428 | $26,100 | Not Implemented |
SF0363 # 03 Y:2008 | 03 | 2008 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,754 | $3,506 | Implemented |
SF0363 # 04 Y:2008 | 04 | 2008 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $6,525 | $14,831 | Not Implemented |
SF0363 # 01 Y:2008 | 01 | 2008 | REPAIR AND ELIMINATE STEAM LEAKS | $2,927 | $0 | Implemented |
DL0024 # 01 Y:2008 | 01 | 2008 | RECOVER WASTE HEAT FROM EQUIPMENT | $160,536 | $150,000 | Not Implemented |
SF0363 # 05 Y:2008 | 05 | 2008 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $9,481 | $69,656 | Not Implemented |
SF0363 # 02 Y:2008 | 02 | 2008 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $968 | $1,145 | Implemented |
DL0024 # 06 Y:2008 | 06 | 2008 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $37,200 | $112,000 | Implemented |
DL0024 # 05 Y:2008 | 05 | 2008 | REPAIR AND ELIMINATE STEAM LEAKS | $10,800 | $1,200 | Implemented |
DL0024 # 04 Y:2008 | 04 | 2008 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $12,421 | $3,877 | Not Implemented |
DL0024 # 03 Y:2008 | 03 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $21,865 | $11,000 | Implemented |
DL0024 # 02 Y:2008 | 02 | 2008 | REPLACE BOILER | $116,210 | $102,000 | Not Implemented |
DL0015 # 06 Y:2008 | 06 | 2008 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $14,000 | $16,000 | Not Implemented |
DL0015 # 07 Y:2008 | 07 | 2008 | REPLACE BOILER | $13,000 | $20,000 | Not Implemented |
DL0015 # 02 Y:2008 | 02 | 2008 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,400 | $3,500 | Implemented |
DL0015 # 05 Y:2008 | 05 | 2008 | INSTALL / REPAIR INSULATION ON STEAM LINES | $5,911 | $2,500 | Implemented |