Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
55
matching recommendationsNAICS | 3121 | Beverage Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0429 # 06 Y:2009 | 06 | 2009 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $12,625 | $0 | Not Implemented |
UF0429 # 14 Y:2009 | 14 | 2009 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $68,295 | $0 | Not Implemented |
UF0429 # 13 Y:2009 | 13 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $42,269 | $0 | Implemented |
UF0429 # 11 Y:2009 | 11 | 2009 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $14,435 | $0 | Not Implemented |
UF0429 # 10 Y:2009 | 10 | 2009 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,346 | $0 | Not Implemented |
UF0429 # 09 Y:2009 | 09 | 2009 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $19,795 | $0 | Not Implemented |
UF0429 # 02 Y:2009 | 02 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $19,766 | $0 | Implemented |
UF0429 # 01 Y:2009 | 01 | 2009 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $1,635 | $0 | Implemented |
UF0429 # 12 Y:2009 | 12 | 2009 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $16,025 | $0 | Not Implemented |
UF0429 # 07 Y:2009 | 07 | 2009 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $45,514 | $0 | Not Implemented |
UF0429 # 08 Y:2009 | 08 | 2009 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $2,119 | $0 | Not Implemented |
UF0429 # 04 Y:2009 | 04 | 2009 | LOWER LIGHT FIXTURES IN HIGH CEILING AREAS | $1,899 | $0 | Not Implemented |
UF0429 # 05 Y:2009 | 05 | 2009 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $334 | $0 | Implemented |
UF0429 # 03 Y:2009 | 03 | 2009 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $4,130 | $0 | Not Implemented |
UD0805 # 12 Y:2009 | 12 | 2009 | CHECK FOR ACCURACY OF UTILITY / POWER METERS | $3,741 | $0 | Not Implemented |
UD0805 # 11 Y:2009 | 11 | 2009 | INSULATE BARE EQUIPMENT | $3,797 | $4,283 | Implemented |
UD0805 # 10 Y:2009 | 10 | 2009 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $4,119 | $0 | Implemented |
UD0805 # 09 Y:2009 | 09 | 2009 | REDUCE EXCESSIVE BOILER BLOWDOWN | $5,312 | $5,000 | Implemented |
UD0805 # 08 Y:2009 | 08 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,938 | $6,703 | Implemented |
UD0805 # 07 Y:2009 | 07 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,327 | $8,043 | Implemented |
UD0805 # 06 Y:2009 | 06 | 2009 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $10,710 | $16,000 | Not Implemented |
UD0805 # 01 Y:2009 | 01 | 2009 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $39,022 | $12,000 | Not Implemented |
UD0805 # 18 Y:2009 | 18 | 2009 | ISOLATE HOT OR COLD EQUIPMENT | $666 | $0 | Implemented |
UD0805 # 17 Y:2009 | 17 | 2009 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $1,423 | $0 | Not Implemented |
UD0805 # 14 Y:2009 | 14 | 2009 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $2,965 | $0 | Implemented |