Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
65
matching recommendationsNAICS | 3121 | Beverage Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0835 # 10 Y:2012 | 10 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,937 | $1,000 | Implemented |
OK0835 # 14 Y:2012 | 14 | 2012 | CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS | $987 | $240 | Not Implemented |
OK0835 # 12 Y:2012 | 12 | 2012 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $31,425 | $0 | Implemented |
OK0835 # 09 Y:2012 | 09 | 2012 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $5,068 | $1,288 | Not Implemented |
OK0835 # 08 Y:2012 | 08 | 2012 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $10,097 | $24,155 | Not Implemented |
OK0835 # 11 Y:2012 | 11 | 2012 | PROVIDE PROPER MAINTENANCE OF MOTOR DRIVEN EQUIPMENT | $621 | $120 | Implemented |
OK0835 # 07 Y:2012 | 07 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $26,139 | $33,990 | Not Implemented |
OK0835 # 06 Y:2012 | 06 | 2012 | RECOVER WASTE HEAT FROM EQUIPMENT | $18,902 | $19,520 | Not Implemented |
OK0835 # 05 Y:2012 | 05 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $815 | $5,126 | Not Implemented |
OK0835 # 04 Y:2012 | 04 | 2012 | INSTALL OCCUPANCY SENSORS | $538 | $3,183 | Implemented |
OK0835 # 03 Y:2012 | 03 | 2012 | REPLACE BOILER | $10,532 | $96,000 | Not Implemented |
OK0835 # 02 Y:2012 | 02 | 2012 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $5,644 | $17,103 | Not Implemented |
OK0835 # 13 Y:2012 | 13 | 2012 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $8,840 | $4,000 | Not Implemented |
OK0835 # 01 Y:2012 | 01 | 2012 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $4,445 | $1,500 | Implemented |
UD0865 # 06 Y:2012 | 06 | 2012 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $992 | $1,000 | Not Implemented |
UD0865 # 04 Y:2012 | 04 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,395 | $1,000 | Not Implemented |
UD0865 # 03 Y:2012 | 03 | 2012 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $30,494 | $36,750 | Not Implemented |
UD0865 # 08 Y:2012 | 08 | 2012 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $5,463 | $0 | Not Implemented |
UD0865 # 09 Y:2012 | 09 | 2012 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $4,015 | $9,000 | Not Implemented |
UD0865 # 07 Y:2012 | 07 | 2012 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $966 | $1,600 | Not Implemented |
UD0865 # 05 Y:2012 | 05 | 2012 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $1,071 | $1,500 | Not Implemented |
UD0865 # 02 Y:2012 | 02 | 2012 | INSTALL OCCUPANCY SENSORS | $4,289 | $1,200 | Not Implemented |
UD0865 # 01 Y:2012 | 01 | 2012 | OPTIMIZE PLANT POWER FACTOR | $3,291 | $8,000 | Not Implemented |
UD0865 # 15 Y:2012 | 15 | 2012 | BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT | $14,957 | $123,000 | Not Implemented |
UD0865 # 10 Y:2012 | 10 | 2012 | USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER | $3,073 | $9,219 | Not Implemented |