Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
113
matching recommendationsNAICS | 3121 | Beverage Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0696 # 04 Y:2017 | 04 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,910 | $10,116 | Not Implemented |
OR0696 # 03 Y:2017 | 03 | 2017 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $2,365 | $5,880 | Not Implemented |
OR0696 # 02 Y:2017 | 02 | 2017 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $79,265 | $37,275 | Not Implemented |
OR0696 # 01 Y:2017 | 01 | 2017 | DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS | $179,573 | $3,044 | Not Implemented |
SF0510 # 06 Y:2017 | 06 | 2017 | USE SOLAR HEAT TO MAKE ELECTRICTY | $56,686 | $504,000 | Not Implemented |
SF0510 # 04 Y:2017 | 04 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,454 | $9,120 | Implemented |
SF0510 # 05 Y:2017 | 05 | 2017 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,192 | $3,095 | Implemented |
SF0510 # 01 Y:2017 | 01 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $494 | $90 | Implemented |
SF0510 # 03 Y:2017 | 03 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,182 | $12,002 | Implemented |
SF0510 # 02 Y:2017 | 02 | 2017 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $44,781 | $7,188 | Not Implemented |
SF0509 # 04 Y:2017 | 04 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $596 | $140 | Not Implemented |
SF0509 # 08 Y:2017 | 08 | 2017 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $7,625 | $31,216 | Not Implemented |
SF0509 # 09 Y:2017 | 09 | 2017 | ADOPT IN-HOUSE MATERIAL GENERATION | $38,233 | $90,166 | Not Implemented |
SF0509 # 06 Y:2017 | 06 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $38,416 | $53,848 | Implemented |
SF0509 # 03 Y:2017 | 03 | 2017 | INSTALL TIMERS AND/OR THERMOSTATS | $17,732 | $2,539 | Implemented |
SF0509 # 07 Y:2017 | 07 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $12,893 | $42,428 | Implemented |
SF0509 # 05 Y:2017 | 05 | 2017 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $11,813 | $10,550 | Implemented |
SF0509 # 01 Y:2017 | 01 | 2017 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $2,452 | $0 | Not Implemented |
SF0509 # 02 Y:2017 | 02 | 2017 | CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS | $6,821 | $0 | Not Implemented |
BS0106 # 01 Y:2017 | 01 | 2017 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $374 | $275 | Implemented |
BS0106 # 03 Y:2017 | 03 | 2017 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $2,159 | $710 | Implemented |
BS0106 # 02 Y:2017 | 02 | 2017 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $185 | $48 | Implemented |
SF0507 # 06 Y:2017 | 06 | 2017 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $5,369 | $12,526 | Implemented |
SF0507 # 05 Y:2017 | 05 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $116,456 | $172,681 | Implemented |
SF0507 # 03 Y:2017 | 03 | 2017 | REPAIR AND ELIMINATE STEAM LEAKS | $1,567 | $156 | Implemented |