IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

135

matching recommendations
Reset
NAICS 3121 Beverage Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0158 # 07 Y:2019 07 2019 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $306 $260 Implemented
UU0158 # 06 Y:2019 06 2019 ELIMINATE/REDUCE AN OPERATION $445 $0 Implemented
UU0158 # 05 Y:2019 05 2019 LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT $451 $1,100 Implemented
UU0158 # 01 Y:2019 01 2019 USE A DIFFERENT OR RECYCLED RAW MATERIAL $6,933 $50,000 Not Implemented
UU0158 # 03 Y:2019 03 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,726 $2,762 Implemented
UU0158 # 02 Y:2019 02 2019 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,811 $160 Not Implemented
UU0158 # 04 Y:2019 04 2019 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $740 $800 Not Implemented
UK1911 # 05 Y:2019 05 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,560 $3,950 Implemented
UK1911 # 06 Y:2019 06 2019 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $4,615 $7,400 Not Implemented
UK1911 # 07 Y:2019 07 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,750 $0 Not Implemented
UK1911 # 08 Y:2019 08 2019 INSULATE BARE EQUIPMENT $26,686 $9,826 Not Implemented
OR0725 # 03 Y:2019 03 2019 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $126,211 $375,000 Implemented
OR0725 # 02 Y:2019 02 2019 RECOVER AND REUSE WASTE MATERIAL $58,445 $110,790 Implemented
OR0725 # 01 Y:2019 01 2019 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $16,581 $12,780 Not Implemented
OR0725 # 04 Y:2019 04 2019 REPLACE BOILER $2,159 $0 Not Implemented
UK1911 # 04 Y:2019 04 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,363 $700 Implemented
UK1911 # 02 Y:2019 02 2019 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS $487,425 $1,600,000 Not Implemented
UK1911 # 03 Y:2019 03 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,273 $24,987 Implemented
UK1911 # 01 Y:2019 01 2019 OPTIMIZE PLANT POWER FACTOR $45,696 $27,825 Implemented
NL0034 # 03 Y:2019 03 2019 INSTALL OCCUPANCY SENSORS $1,679 $4,388 Not Implemented
NL0034 # 04 Y:2019 04 2019 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $493 $0 Not Implemented
NL0034 # 06 Y:2019 06 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $238 $500 Implemented
NL0034 # 05 Y:2019 05 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $248 $0 Not Implemented
NL0034 # 07 Y:2019 07 2019 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $122 $275 Implemented
NL0034 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,764 $8,337 Implemented