Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
135
matching recommendationsNAICS | 3121 | Beverage Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UU0158 # 07 Y:2019 | 07 | 2019 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $306 | $260 | Implemented |
UU0158 # 06 Y:2019 | 06 | 2019 | ELIMINATE/REDUCE AN OPERATION | $445 | $0 | Implemented |
UU0158 # 05 Y:2019 | 05 | 2019 | LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT | $451 | $1,100 | Implemented |
UU0158 # 01 Y:2019 | 01 | 2019 | USE A DIFFERENT OR RECYCLED RAW MATERIAL | $6,933 | $50,000 | Not Implemented |
UU0158 # 03 Y:2019 | 03 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,726 | $2,762 | Implemented |
UU0158 # 02 Y:2019 | 02 | 2019 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,811 | $160 | Not Implemented |
UU0158 # 04 Y:2019 | 04 | 2019 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $740 | $800 | Not Implemented |
UK1911 # 05 Y:2019 | 05 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,560 | $3,950 | Implemented |
UK1911 # 06 Y:2019 | 06 | 2019 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $4,615 | $7,400 | Not Implemented |
UK1911 # 07 Y:2019 | 07 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,750 | $0 | Not Implemented |
UK1911 # 08 Y:2019 | 08 | 2019 | INSULATE BARE EQUIPMENT | $26,686 | $9,826 | Not Implemented |
OR0725 # 03 Y:2019 | 03 | 2019 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $126,211 | $375,000 | Implemented |
OR0725 # 02 Y:2019 | 02 | 2019 | RECOVER AND REUSE WASTE MATERIAL | $58,445 | $110,790 | Implemented |
OR0725 # 01 Y:2019 | 01 | 2019 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $16,581 | $12,780 | Not Implemented |
OR0725 # 04 Y:2019 | 04 | 2019 | REPLACE BOILER | $2,159 | $0 | Not Implemented |
UK1911 # 04 Y:2019 | 04 | 2019 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,363 | $700 | Implemented |
UK1911 # 02 Y:2019 | 02 | 2019 | UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS | $487,425 | $1,600,000 | Not Implemented |
UK1911 # 03 Y:2019 | 03 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,273 | $24,987 | Implemented |
UK1911 # 01 Y:2019 | 01 | 2019 | OPTIMIZE PLANT POWER FACTOR | $45,696 | $27,825 | Implemented |
NL0034 # 03 Y:2019 | 03 | 2019 | INSTALL OCCUPANCY SENSORS | $1,679 | $4,388 | Not Implemented |
NL0034 # 04 Y:2019 | 04 | 2019 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $493 | $0 | Not Implemented |
NL0034 # 06 Y:2019 | 06 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $238 | $500 | Implemented |
NL0034 # 05 Y:2019 | 05 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $248 | $0 | Not Implemented |
NL0034 # 07 Y:2019 | 07 | 2019 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $122 | $275 | Implemented |
NL0034 # 01 Y:2019 | 01 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,764 | $8,337 | Implemented |