IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

126

matching recommendations
Reset
NAICS 3121 Beverage Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CM1029 # 06 Y:2023 06 2023 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $1,800 $0 Implemented
CM1029 # 05 Y:2023 05 2023 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $76,117 $8,000 Implemented
CM1029 # 04 Y:2023 04 2023 REPLACE BOILER $8,337 $38,130 Implemented
CM1029 # 01 Y:2023 01 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $14,259 $23,838 Not Implemented
CM1029 # 02 Y:2023 02 2023 INCREASE EFFICIENCY OF TRUCKS $113,963 $779,750 Not Implemented
CM1029 # 03 Y:2023 03 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $8,556 $3,717 Not Implemented
AS0567 # 02 Y:2023 02 2023 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $86,125 $165,996 Not Implemented
AS0567 # 01 Y:2023 01 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $100,430 $774,239 Implemented
AS0567 # 05 Y:2023 05 2023 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $647 $384 Not Implemented
AS0567 # 04 Y:2023 04 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,255 $31,926 Not Implemented
AS0567 # 03 Y:2023 03 2023 UPGRADE CONTROLS ON COMPRESSORS $57,803 $10,720 Not Implemented
UA0282 # 04 Y:2023 04 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $927 $1,176 n/a
UA0282 # 01 Y:2023 01 2023 REPAIR OR REPLACE STEAM TRAPS $3,672 $165 n/a
UA0282 # 03 Y:2023 03 2023 INSTALL TIMERS AND/OR THERMOSTATS $1,197 $297 n/a
UA0282 # 02 Y:2023 02 2023 REDUCE EXCESSIVE BOILER BLOWDOWN $3,292 $5,675 n/a
UA0282 # 05 Y:2023 05 2023 INSTALL OCCUPANCY SENSORS $1,227 $1,174 n/a
UA0282 # 06 Y:2023 06 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $95 $250 n/a
SF0609 # 09 Y:2023 09 2023 INSTALL WIND POWERED ELECTRIC GENERATOR $426,217 $1,338,900 Not Implemented
SF0609 # 05 Y:2023 05 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $32,617 $36,367 Implemented
SF0609 # 06 Y:2023 06 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $56,467 $66,447 Implemented
SF0609 # 04 Y:2023 04 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,090 $2,155 Implemented
SF0609 # 07 Y:2023 07 2023 USE OPTIMUM THICKNESS INSULATION $8,652 $21,442 Not Implemented
SF0609 # 08 Y:2023 08 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,153 $9,827 Not Implemented
SF0609 # 03 Y:2023 03 2023 USE OPTIMUM THICKNESS INSULATION $1,473 $338 Implemented
SF0609 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,389 $1,640 Implemented