IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

407

matching recommendations
Reset
NAICS 31211 Soft Drink and Ice Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0907 # 07 Y:2015 07 2015 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,403 $800 Implemented
OK0907 # 09 Y:2015 09 2015 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $2,429 $960 Implemented
OK0907 # 11 Y:2015 11 2015 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $2,466 $0 Implemented
OK0907 # 12 Y:2015 12 2015 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $1,510 $3,052 Implemented
SU0365 # 01 Y:2014 01 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,680 $0 Implemented
SU0365 # 02 Y:2014 02 2014 USE SYNTHETIC LUBRICANT $3,020 $0 Implemented
SU0365 # 03 Y:2014 03 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,916 $0 Implemented
SU0365 # 06 Y:2014 06 2014 INSTALL / REPAIR INSULATION ON STEAM LINES $16,723 $4,216 Implemented
SU0365 # 07 Y:2014 07 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,452 $1,050 Implemented
SU0365 # 09 Y:2014 09 2014 INSTALL OCCUPANCY SENSORS $180 $317 Implemented
OR0631 # 01 Y:2014 01 2014 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $11,360 $250 Implemented
OR0631 # 03 Y:2014 03 2014 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,567 $1,634 Implemented
OR0631 # 04 Y:2014 04 2014 INSTALL / REPAIR INSULATION ON STEAM LINES $800 $417 Implemented
TT0129 # 04 Y:2014 04 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,882 $3,000 Implemented
TT0138 # 06 Y:2014 06 2014 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $354 $500 Implemented
TT0138 # 07 Y:2014 07 2014 OPTIMIZE PLANT POWER FACTOR $6,063 $18,225 Implemented
TT0138 # 03 Y:2014 03 2014 UPGRADE CONTROLS ON COMPRESSORS $3,131 $800 Implemented
TT0138 # 04 Y:2014 04 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $899 $300 Implemented
TT0138 # 05 Y:2014 05 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $88 $90 Implemented
MA0717 # 02 Y:2013 02 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,293 $8,275 Implemented
MA0717 # 04 Y:2013 04 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,986 $5,700 Implemented
MA0717 # 05 Y:2013 05 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,679 $4,082 Implemented
AM0641 # 01 Y:2013 01 2013 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $81,000 $40,000 Implemented
AM0641 # 02 Y:2013 02 2013 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $45,620 $50,000 Implemented
AM0641 # 03 Y:2013 03 2013 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $8,894 $31,100 Implemented