IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

73

matching recommendations
Reset
NAICS 31211 Soft Drink and Ice Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0411 # 02 Y:2022 02 2022 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $15,400 $630 Implemented
MI0411 # 03 Y:2022 03 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,210 $1,650 Implemented
MI0411 # 06 Y:2022 06 2022 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $4,028 $0 Implemented
MI0411 # 07 Y:2022 07 2022 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $3,063 $27,147 Implemented
UF0550 # 05 Y:2020 05 2020 MODIFY STORAGE SPACE TO AVOID RENTAL OF A WAREHOUSE $383,788 $897,972 Implemented
UF0550 # 01 Y:2020 01 2020 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $41,888 $29,990 Implemented
UF0550 # 02 Y:2020 02 2020 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $11,802 $30,000 Implemented
UF0550 # 03 Y:2020 03 2020 INSTALL TURBULATORS $3,921 $11,250 Implemented
UF0550 # 04 Y:2020 04 2020 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,928 $2,800 Implemented
MI0350 # 02 Y:2019 02 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $137,608 $23,779 Implemented
MI0350 # 13 Y:2019 13 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,052 $80 Implemented
MI0350 # 01 Y:2019 01 2019 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $234,952 $172,151 Implemented
MI0350 # 07 Y:2019 07 2019 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $18,627 $1,126 Implemented
MI0350 # 12 Y:2019 12 2019 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $2,203 $410 Implemented
MI0332 # 02 Y:2018 02 2018 MINIMIZE WATER USAGE $30,000 $5,400 Implemented
MI0332 # 03 Y:2018 03 2018 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $29,437 $39,837 Implemented
MI0332 # 01 Y:2018 01 2018 TURN OFF EQUIPMENT WHEN NOT IN USE $37,879 $3,280 Implemented
MI0332 # 05 Y:2018 05 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,738 $15,667 Implemented
MI0332 # 06 Y:2018 06 2018 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $3,193 $568 Implemented
MI0332 # 08 Y:2018 08 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,047 $5,203 Implemented
MI0332 # 10 Y:2018 10 2018 INSTALL OCCUPANCY SENSORS $768 $2,041 Implemented
MI0316 # 09 Y:2017 09 2017 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $7,991 $2,140 Implemented
MI0316 # 11 Y:2017 11 2017 INSTALL OCCUPANCY SENSORS $4,454 $1,280 Implemented
MI0316 # 12 Y:2017 12 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,829 $4,674 Implemented
MI0316 # 13 Y:2017 13 2017 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,011 $654 Implemented