IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

969

matching recommendations
Reset
NAICS 31211 Soft Drink and Ice Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0332 # 08 Y:2018 08 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,047 $5,203 Implemented
MI0332 # 09 Y:2018 09 2018 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,178 $480 Not Implemented
MI0332 # 10 Y:2018 10 2018 INSTALL OCCUPANCY SENSORS $768 $2,041 Implemented
LE0452 # 01 Y:2018 01 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,430 $1,000 Not Implemented
LE0452 # 02 Y:2018 02 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,260 $600 Not Implemented
LE0452 # 03 Y:2018 03 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,616 $17,500 Not Implemented
LE0452 # 04 Y:2018 04 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,984 $45,750 Not Implemented
LE0452 # 05 Y:2018 05 2018 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $40,671 $115,000 Not Implemented
LE0452 # 06 Y:2018 06 2018 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $155,577 $500,000 Not Implemented
LE0452 # 07 Y:2018 07 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,026 $9,190 Not Implemented
LE0452 # 08 Y:2018 08 2018 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $6,475 $30,000 Not Implemented
LE0452 # 09 Y:2018 09 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,055 $5,250 Not Implemented
AS0450 # 01 Y:2018 01 2018 UTILIZE A LESS EXPENSIVE COOLING METHOD $35,156 $4,000 Not Implemented
AS0450 # 02 Y:2018 02 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $22,239 $400 Not Implemented
AS0450 # 03 Y:2018 03 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,775 $3,994 Implemented
AS0450 # 04 Y:2018 04 2018 AVOID FROST FORMATION ON EVAPORATORS $865 $195 Not Implemented
MI0316 # 01 Y:2017 01 2017 USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS $313,428 $142,400 Not Implemented
MI0316 # 02 Y:2017 02 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $72,034 $39,216 Implemented
MI0316 # 03 Y:2017 03 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,854 $61,030 Implemented
MI0316 # 04 Y:2017 04 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $21,732 $1,660 Implemented
MI0316 # 05 Y:2017 05 2017 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $14,995 $120 Implemented
MI0316 # 06 Y:2017 06 2017 INSTALL OCCUPANCY SENSORS $10,816 $7,881 Implemented
MI0316 # 07 Y:2017 07 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $9,887 $4,577 Not Implemented
MI0316 # 08 Y:2017 08 2017 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $8,115 $18,100 Not Implemented
MI0316 # 09 Y:2017 09 2017 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $7,991 $2,140 Implemented