IAC Assessment: AS0454
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0454
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 2018
Principal Product Packaged Ice
NAICS 312113 - Ice Manufacturing
SIC 2097 - Manufactured Ice
Sales $50,000,000-$100,000,000
# of Employees 60
Plant Area (Sq.Ft.) 80,000
Annual Production 200,000,000 Pounds
Production Hrs. Annual 7,300
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,128,432 12,912,476 kWh $0.09
Electricity Demand $193,237 32,193 kW-months/year $6.00
TOTAL ENERGY COSTS $1,321,669
RECOMMENDED SAVINGS* $381,478 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$274,952
Cost:
$196,499
$246,461 2,823,154 $28,491 4,749 $246,461
2,823,154
kWh
$28,491
4,749
kW-months/year
02: 2.6222 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS Savings:
$64,677
Cost:
-
$64,677 740,880 - - $64,677
740,880
kWh
-
-
kW-months/year
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$13,697
Cost:
$12,185
$12,185 139,577 $1,512 252 $12,185
139,577
kWh
$1,512
252
kW-months/year
04: 3.1162 USE LESS WASTEFUL PACKAGING Savings:
$12,596
Cost:
$196
$12,596 144,279 - - $12,596
144,279
kWh
-
-
kW-months/year
05: 2.3113 MAKE ICE DURING OFF PEAK HOURS FOR COOLING Savings:
$11,530
Cost:
$150
$2,553 29,249 $8,977 1,495 $2,553
29,249
kWh
$8,977
1,495
kW-months/year
06: 2.2511 INSULATE BARE EQUIPMENT Savings:
$4,026
Cost:
$3,043
$3,616 41,423 $410 68 $3,616
41,423
kWh
$410
68
kW-months/year
TOTAL RECOMMENDED Savings:
$381,478
Cost:
$212,073
$342,088 3,918,562 $39,390 6,564 $342,088
3,918,562
kWh
$39,390
6,564
kW-months/year
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand