Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
969
matching recommendationsNAICS | 31211 | Soft Drink and Ice Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UA0021 # 08 Y:2008 | 08 | 2008 | INSTALL OCCUPANCY SENSORS | $278 | $271 | Not Implemented |
UA0021 # 09 Y:2008 | 09 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $21,436 | $49,534 | Not Implemented |
UA0021 # 10 Y:2008 | 10 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,186 | $1,050 | Not Implemented |
UA0021 # 11 Y:2008 | 11 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,899 | $37,307 | Not Implemented |
UA0021 # 12 Y:2008 | 12 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,333 | $4,911 | Not Implemented |
NC0372 # 01 Y:2008 | 01 | 2008 | OPTIMIZE PLANT POWER FACTOR | $10,092 | $8,000 | Not Implemented |
NC0372 # 02 Y:2008 | 02 | 2008 | COMBINE UTILITY METERS | $61,386 | $25,000 | Not Implemented |
NC0372 # 03 Y:2008 | 03 | 2008 | ADJUST BURNERS FOR EFFICIENT OPERATION | $1,636 | $1,600 | Not Implemented |
NC0372 # 04 Y:2008 | 04 | 2008 | RECOVER WASTE HEAT FROM EQUIPMENT | $255,208 | $500,000 | Not Implemented |
NC0372 # 05 Y:2008 | 05 | 2008 | INSULATE BARE EQUIPMENT | $721 | $250 | Not Implemented |
NC0372 # 06 Y:2008 | 06 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $7,090 | $50 | Not Implemented |
NC0372 # 07 Y:2008 | 07 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,240 | $100 | Not Implemented |
NC0372 # 08 Y:2008 | 08 | 2008 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $10,110 | $8,000 | Not Implemented |
LE0267 # 01 Y:2008 | 01 | 2008 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $198,263 | $200,000 | Not Implemented |
LE0267 # 02 Y:2008 | 02 | 2008 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $41,140 | $6,000 | Implemented |
LE0267 # 03 Y:2008 | 03 | 2008 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $36,169 | $30,000 | Implemented |
LE0267 # 04 Y:2008 | 04 | 2008 | REPAIR OR REPLACE STEAM TRAPS | $31,944 | $2,000 | Implemented |
LE0267 # 05 Y:2008 | 05 | 2008 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $21,795 | $30,000 | Not Implemented |
LE0267 # 06 Y:2008 | 06 | 2008 | CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS | $26,495 | $31,435 | Not Implemented |
LE0267 # 07 Y:2008 | 07 | 2008 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $9,200 | $3,000 | Implemented |
LE0267 # 08 Y:2008 | 08 | 2008 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $8,134 | $1,500 | Not Implemented |
LE0267 # 09 Y:2008 | 09 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,723 | $1,000 | Implemented |
LE0267 # 10 Y:2008 | 10 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,129 | $300,000 | Implemented |
UF0407 # 01 Y:2008 | 01 | 2008 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $72,878 | $27,259 | Not Implemented |
UF0407 # 02 Y:2008 | 02 | 2008 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,924 | $9,726 | Implemented |