Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
969
matching recommendationsNAICS | 31211 | Soft Drink and Ice Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AS0355 # 03 Y:2003 | 03 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $210 | $15 | Not Implemented |
AS0355 # 04 Y:2003 | 04 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $350 | $30 | Not Implemented |
AS0355 # 05 Y:2003 | 05 | 2003 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $573 | $1,500 | Not Implemented |
AS0355 # 06 Y:2003 | 06 | 2003 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $2,083 | $200 | Not Implemented |
AS0355 # 07 Y:2003 | 07 | 2003 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $161 | $211 | Not Implemented |
AS0355 # 08 Y:2003 | 08 | 2003 | INSTALL AUTOMATIC PACKING EQUIPMENT | $3,492 | $22,000 | Not Implemented |
UM0231 # 01 Y:2003 | 01 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,750 | $7,445 | Not Implemented |
UM0231 # 02 Y:2003 | 02 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,000 | $2,250 | Not Implemented |
UM0231 # 03 Y:2003 | 03 | 2003 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $1,320 | $1,500 | Not Implemented |
UM0231 # 04 Y:2003 | 04 | 2003 | HEAT WATER WITH EXHAUST HEAT | $6,519 | $7,500 | Not Implemented |
UM0231 # 05 Y:2003 | 05 | 2003 | REPLACE BOILER | $6,310 | $2,500 | Not Implemented |
UU0044 # 01 Y:2003 | 01 | 2003 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,210 | $3,508 | Not Implemented |
UU0044 # 02 Y:2003 | 02 | 2003 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $2,130 | $0 | Implemented |
UU0044 # 03 Y:2003 | 03 | 2003 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,390 | $5,000 | Not Implemented |
UU0044 # 04 Y:2003 | 04 | 2003 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,476 | $800 | Implemented |
UU0044 # 05 Y:2003 | 05 | 2003 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $1,070 | $0 | Not Implemented |
UU0044 # 06 Y:2003 | 06 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,211 | $7,976 | Not Implemented |
GT0750 # 01 Y:2003 | 01 | 2003 | ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS | $5,393 | $1,350 | Implemented |
GT0750 # 02 Y:2003 | 02 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $226 | $400 | Implemented |
GT0750 # 03 Y:2003 | 03 | 2003 | CONTROL PRESSURE ON STEAMER OPERATIONS | $1,680 | $0 | Not Implemented |
GT0750 # 04 Y:2003 | 04 | 2003 | USE SYNTHETIC LUBRICANT | $6,298 | $0 | Implemented |
GT0750 # 05 Y:2003 | 05 | 2003 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,058 | $372 | Implemented |
GT0750 # 06 Y:2003 | 06 | 2003 | INCREASE AMOUNT OF CONDENSATE RETURNED | $17,688 | $5,200 | Not Implemented |
GT0750 # 07 Y:2003 | 07 | 2003 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $35,980 | $15,000 | Not Implemented |
GT0750 # 08 Y:2003 | 08 | 2003 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $9,570 | $27,000 | Not Implemented |