IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

969

matching recommendations
Reset
NAICS 31211 Soft Drink and Ice Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0355 # 03 Y:2003 03 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $210 $15 Not Implemented
AS0355 # 04 Y:2003 04 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $350 $30 Not Implemented
AS0355 # 05 Y:2003 05 2003 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $573 $1,500 Not Implemented
AS0355 # 06 Y:2003 06 2003 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,083 $200 Not Implemented
AS0355 # 07 Y:2003 07 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $161 $211 Not Implemented
AS0355 # 08 Y:2003 08 2003 INSTALL AUTOMATIC PACKING EQUIPMENT $3,492 $22,000 Not Implemented
UM0231 # 01 Y:2003 01 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,750 $7,445 Not Implemented
UM0231 # 02 Y:2003 02 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,000 $2,250 Not Implemented
UM0231 # 03 Y:2003 03 2003 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,320 $1,500 Not Implemented
UM0231 # 04 Y:2003 04 2003 HEAT WATER WITH EXHAUST HEAT $6,519 $7,500 Not Implemented
UM0231 # 05 Y:2003 05 2003 REPLACE BOILER $6,310 $2,500 Not Implemented
UU0044 # 01 Y:2003 01 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,210 $3,508 Not Implemented
UU0044 # 02 Y:2003 02 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,130 $0 Implemented
UU0044 # 03 Y:2003 03 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,390 $5,000 Not Implemented
UU0044 # 04 Y:2003 04 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,476 $800 Implemented
UU0044 # 05 Y:2003 05 2003 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,070 $0 Not Implemented
UU0044 # 06 Y:2003 06 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,211 $7,976 Not Implemented
GT0750 # 01 Y:2003 01 2003 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $5,393 $1,350 Implemented
GT0750 # 02 Y:2003 02 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $226 $400 Implemented
GT0750 # 03 Y:2003 03 2003 CONTROL PRESSURE ON STEAMER OPERATIONS $1,680 $0 Not Implemented
GT0750 # 04 Y:2003 04 2003 USE SYNTHETIC LUBRICANT $6,298 $0 Implemented
GT0750 # 05 Y:2003 05 2003 INSTALL / REPAIR INSULATION ON STEAM LINES $1,058 $372 Implemented
GT0750 # 06 Y:2003 06 2003 INCREASE AMOUNT OF CONDENSATE RETURNED $17,688 $5,200 Not Implemented
GT0750 # 07 Y:2003 07 2003 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $35,980 $15,000 Not Implemented
GT0750 # 08 Y:2003 08 2003 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $9,570 $27,000 Not Implemented