Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
343
matching recommendationsNAICS | 312111 | Soft Drink Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TR0010 # 03 Y:2019 | 03 | 2019 | INSULATE BARE EQUIPMENT | $1,984 | $70 | Implemented |
TR0010 # 02 Y:2019 | 02 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $30,332 | $36,474 | Implemented |
TR0010 # 01 Y:2019 | 01 | 2019 | OPTIMIZE PLANT POWER FACTOR | $16,540 | $17,881 | Implemented |
MI0350 # 13 Y:2019 | 13 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,052 | $80 | Implemented |
MI0350 # 12 Y:2019 | 12 | 2019 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $2,203 | $410 | Implemented |
MI0350 # 07 Y:2019 | 07 | 2019 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $18,627 | $1,126 | Implemented |
MI0350 # 02 Y:2019 | 02 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $137,608 | $23,779 | Implemented |
MI0350 # 01 Y:2019 | 01 | 2019 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $234,952 | $172,151 | Implemented |
IC0212 # 01 Y:2019 | 01 | 2019 | BASE UTILITY CHARGES ON USAGE RATHER THAN AREA OCCUPIED | $59,063 | $2,920 | Implemented |
OK1003 # 05 Y:2019 | 05 | 2019 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $10,817 | $1,400 | Implemented |
OK1003 # 02 Y:2019 | 02 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,094 | $11,817 | Implemented |
OK1003 # 01 Y:2019 | 01 | 2019 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,820 | $1,545 | Implemented |
OK1003 # 03 Y:2019 | 03 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,476 | $56,018 | Implemented |
OK1003 # 07 Y:2019 | 07 | 2019 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $48,286 | $9,545 | Implemented |
LS1904 # 06 Y:2019 | 06 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $64,763 | $45,810 | Implemented |
LS1904 # 02 Y:2019 | 02 | 2019 | IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS | $1,536 | $0 | Implemented |
LS1904 # 01 Y:2019 | 01 | 2019 | REPAIR AND ELIMINATE STEAM LEAKS | $18,805 | $0 | Implemented |
OK0997 # 02 Y:2019 | 02 | 2019 | INSTALL TIMERS AND/OR THERMOSTATS | $17,569 | $1,795 | Implemented |
OK0997 # 04 Y:2019 | 04 | 2019 | RECOVER WASTE HEAT FROM EQUIPMENT | $7,415 | $2,668 | Implemented |
OK0997 # 05 Y:2019 | 05 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,238 | $0 | Implemented |
OK0997 # 06 Y:2019 | 06 | 2019 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,715 | $1,306 | Implemented |
OK0997 # 07 Y:2019 | 07 | 2019 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $4,032 | $0 | Implemented |
OK0997 # 08 Y:2019 | 08 | 2019 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $1,875 | $0 | Implemented |
OK0997 # 10 Y:2019 | 10 | 2019 | CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS | $366 | $485 | Implemented |
AM0757 # 01 Y:2018 | 01 | 2018 | TURN OFF EQUIPMENT WHEN NOT IN USE | $65,410 | $255 | Implemented |