Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
797
matching recommendationsNAICS | 312111 | Soft Drink Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UM0370 # 10 Y:2010 | 10 | 2010 | INSTALL STORM WINDOWS AND DOORS | $1,156 | $9,300 | Implemented |
DL0055 # 01 Y:2010 | 01 | 2010 | RECOVER WASTE HEAT FROM EQUIPMENT | $31,870 | $13,000 | Not Implemented |
DL0055 # 02 Y:2010 | 02 | 2010 | REPLACE BOILER | $59,500 | $102,000 | Not Implemented |
DL0055 # 03 Y:2010 | 03 | 2010 | OPERATE BOILERS ON HIGH FIRE SETTING | $35,000 | $50 | Not Implemented |
DL0055 # 04 Y:2010 | 04 | 2010 | REPLACE TREATED WATER WITH WELL / SURFACE WATER | $39,150 | $100,000 | Not Implemented |
DL0055 # 05 Y:2010 | 05 | 2010 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $82,808 | $125,000 | Implemented |
DL0055 # 06 Y:2010 | 06 | 2010 | USE DIRECT AIR SUPPLY TO EXHAUST HOODS | $9,000 | $3,000 | Implemented |
DL0055 # 07 Y:2010 | 07 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,600 | $1,200 | Implemented |
DL0055 # 08 Y:2010 | 08 | 2010 | REDUCE VENTILATION AIR | $21,000 | $15,000 | Not Implemented |
DL0055 # 09 Y:2010 | 09 | 2010 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $23,200 | $15,000 | Not Implemented |
DL0055 # 10 Y:2010 | 10 | 2010 | KEEP EQUIPMENT CLEAN | $3,631 | $500 | Implemented |
DL0055 # 11 Y:2010 | 11 | 2010 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $3,631 | $1,830 | Implemented |
DL0055 # 12 Y:2010 | 12 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,467 | $6,000 | Implemented |
DL0055 # 13 Y:2010 | 13 | 2010 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $9,935 | $2,840 | Not Implemented |
MI0191 # 01 Y:2010 | 01 | 2010 | HEAT WATER WITH EXHAUST HEAT | $697,331 | $128,000 | Not Implemented |
MI0191 # 02 Y:2010 | 02 | 2010 | USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS | $228,145 | $400,000 | Not Implemented |
MI0191 # 03 Y:2010 | 03 | 2010 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $48,196 | $1,500 | Not Implemented |
MI0191 # 04 Y:2010 | 04 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $47,683 | $1,210 | Implemented |
MI0191 # 05 Y:2010 | 05 | 2010 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $8,572 | $5,300 | Implemented |
SD0427 # 01 Y:2010 | 01 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,780 | $100 | Not Implemented |
SD0427 # 02 Y:2010 | 02 | 2010 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $8,494 | $2,714 | Not Implemented |
SD0427 # 03 Y:2010 | 03 | 2010 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,124 | $1,230 | Not Implemented |
SD0427 # 04 Y:2010 | 04 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,450 | $10,035 | Not Implemented |
SD0427 # 05 Y:2010 | 05 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $486 | $2,200 | Not Implemented |
SD0427 # 06 Y:2010 | 06 | 2010 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $540,797 | $1,949,400 | Not Implemented |